NYC Building Report

Queens Baisley Park

114-54 Sutphin Boulevard, Queens

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

9 records

Date Status Type Summary
Aug 18, 2023 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL REMEDY: FULLY DEMOLISH THE BUILDING. GRADE AND FENCE SITE
Apr 15, 2023 V-DOB VIOLATION - ACTIVE COMPBLD-STRUCTURALLY COMPROMISED BUILDING NONE FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISE
Feb 27, 2023 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL SEAL STRUCTURE IN ACCORDANCE WITH DOB RULES AND REGULATIONS AND MAKE SITE SAFE FROM UNAUTHORIZED ENTRY AND ALL FURTHER DAMAGE
Feb 26, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON COMPLIANT -DAMAGE OBSERVED TO HAVE BEEN SUSTAIN THROUGHOUT THE BUILDING DUE TO FIRE
Jan 10, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM.SVRLY DETERIORATED,ROTTED WOOD JOISTS@1ST FL.1ST FL ENTDRWAY& HALLWAY CRCKD&SAGGING W/CRCKS ALONG THE INT EXP1 WALL.1ST&2NDFL JOISTS IN THE STATE OF DISREPAIR.OWNR TO RETAIN NYSPE TO EVAL ENT BLDG&FILE REPAIR DWGS W/DOB STRT WRK BY 2/27/23 UNDR PRMT&CMPLETE/SGNED OFF BY 4/14/23
Dec 16, 2022 VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE C-CONSTRUCTION OTHER OPTIONAL WORK WITHOUT A PERMIT
Dec 16, 2022 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. MULTIPLE FLOO R JOISTS IN DISREPAIR WITH ROTTED-CRACKED AND DISPLACED CROATING MULTI PLE AREAS WITH HEAVY DEFLECTIONS ALONG WITH 2ND FLOOR JOIST AND CEILIN G JOIST. ENGINEERS REPORT REQUIRED WITHIN 30 DAYS AND SUBMITTED TO EOC DOB
Jan 2, 2013 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jan 2, 2013 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION