Queens Baisley Park
114-48 Sutphin Boulevard, Queens
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 12, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.AT TIME OF INSPECTION OBSERVED FRONT FACE CRACKED& BULGGED OUTWARDS@THE 2NDFL LEVEL.WINDOWS&SKYLIGHT OUTDUE TO FIRE@ADJ 114-46 SUTPHIN BLVD.ROOF VENTED WHOLES OUT IN ROOF DC.COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #081125FEU41204AK (CONTROL #341596) IMMEDIATELY |
| Aug 15, 2025 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: BRACE FAÇADE ETC |
| Aug 11, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.AT TIME OF INSPECTION OBSERVED FRONT FACADE CRACKED&BULGED OUTWARDS@THE 2NDFL LEVEL.WINDOWS&SKYLIGHT OUTDUE TO FIRE@ADJ 114-46 SUTPHIN BLVD.ROOF VENTED W/HOLES OUT IN ROOF DC.OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO EVAL THE ENT BLDG & REPAIR UNDR PRMT.FILE FOR RPAIRS BY 9/25/25.SGN OFF RPAIRS |
| Aug 10, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLIANT AT TIME OF INSPECTION. DAMAGE OBSERVED TO HAVE BEEN SUSTAINED. SMOKE AND WATER DAMAGE, SECTIONS OF CEILINGS MISSING, SKYLIGHT MISSING, AT SECOND FLOOR,DUE TO FIRE IN ADJACENT BUILDING AT 114-46 SUTPHIN BOULEVARD |