Queens Richmond Hill
113-13 Atlantic Avenue, Queens
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
12 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 12, 2017 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH DOB 041114CFEU40901DEH, REQUIRING BUILDING REPAIRS TO BE COMPLETED BY 6/6/14. THE FULL REPORT FROM LICENSED P.E HAS NOT BEEN RECEIVED. COMPLY WITH DOB VIOLATION AND PROVIDE FULL AUTHORIZED REPAIR REPORT BY 4/27/17 |
| Aug 23, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | DAMAGE HAVE BEEN SUSTAINED TO EXP.#3 EXTERIOR STUCCO WALL DUE TO CONST UCTION OPERATION AT 113-17 ATLANTIC AVENUE. CRACKED STUCCO AND OPEN AREAS OF EXTERIOR ALLOWING WATER TO ENTIRE BUILDING AT REAR OF EXP.#3 OF 113-13 ATLANTIC AVENUE |
| Jul 2, 2014 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 21, 2014 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Apr 11, 2014 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAIL TO MAINTAIN 4 STORY OLD LAW TENEMENT SHOWS SIGNS OF FIRE DAMAGE & IMPROPER, UNDOCUMENTED REPAIRS AND SHORING WORK HAVE LIC NYS PE TO PERFORM INSPECTION,PROVIDE FEU REPORT&PREPARE AND SUBMIT REPAIR DRWGS. TO NY DOB FEU BY 5/1/14.OWNER TO OBTAIN PERMIT & START REPAIR WORK BY 5/19.REPAIRS TO BE COMPLETED BY 6/6/14 |
| Jan 19, 2007 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jan 6, 2006 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| May 4, 1998 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 29, 1995 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 7, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 28, 1993 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |