NYC Building Report

Queens Richmond Hill

111-09 Atlantic Avenue, Queens

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

8 records

Date Status Type Summary
Mar 2, 2022 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Dec 22, 2021 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EWO-EXP2(WEST) PARAPET LEANING OUTWARD FOR APPROX 90% OF ITSLENGTH APPEARS THAT CMU BACKUP AT EXP2 PARAPET IS MISSING REBAR &/ORGROUT OWNR HIRE NYSPE TO IMMED DEMO LEANING PRTION OF EXP2 &INSTAL TEMP WATRPROOFNG.ALL WRK DIRCT SUPERV ONSITE PE.FILE PRMTS
Dec 17, 2021 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM-EXP2(WEST) PARAPT LEANING OUTWARD APPROX 90% OF ITS LENGTH.GRANITE GUARDRAIL @INTRIOR STAIRWEL-RSDNTIAL SPACE NOT ANCHORDPROPRLYTO STRCTR &APPEAR CONNCTD W/ADHESIVE&MISSNG PIN/PHYSICAL CONNCTN STRCTR OWNR HIRE NYSPE STRCTR ENGINR-IMMED EVALU ENTIRE BLDG.FILE RPR BY 1/28/22.OBTAIN PRMT&STRT WRK BY 2/14/22.COMPLT 4/4/22
Dec 9, 2021 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT EXPOSURE #2 UPPER SECTION OF FA ADE LEANING OUTWARD ALSO AN APPROXIMATE 4' STEP CRACK. NO ACCESS TO INTERIOR AND ROOF.
Jan 17, 2020 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Mar 3, 2015 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
May 15, 2014 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Jan 29, 2008 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL