NYC Building Report

Queens Breezy Point-Belle Harbor-Rockaway Park-Broad Channel

11 Noel Road, Queens

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

12 records

Date Status Type Summary
Aug 19, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.PER DOB INSPCT ON 12/24/2020,THE BLDG WAS IN A SEVERE STATE OF DSREPAIR W/BLDG EXP2WALL, MISSNG FLOOR JOISTS,MISSNG FLOORBOARDS,NON-ENGINEERD SHORING.OWNR TO IMMEDIATELY RETAIN NYS PE TO FILE A DEMO JOB W/DOB TO LEGALIZE THE WORK,OBTAIN PERMIT, AND LOC
Jul 21, 2021 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jul 21, 2021 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jun 9, 2021 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Dec 30, 2020 V*-DOB VIOLATION - DISMISSED EGNCY-EMERGENCY NONE FULLY DEMOLISH THE 1 STORY BUILDING (BIN 4297339). THE 1 STORY.REAR GARAGE AT 11 GAR NOEL ROAD ( BIN 4584600) SHALL REMAIN
Sep 2, 2020 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
May 13, 2020 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL INSTALL AN APPROX.TOTAL OF 85 LINEAR FT OF CONSTRUCTION FENCE TO COVER THE ENTIRE LENGTH OF EXPOSURE 1 AND EXPOSURE 2 AS WELL AS THE AREA ALONG THE LOT LINE AT EXPOSURE 4 TO ENCLOSE THE FRONT YARD. DIMENSIONS ARE AS FOLLOW APPROX. 25 LINEAR FT ALONG EXP#1, APPROX.50 LINEAR FT AT EXP#4(RIGHT SIDE FRONT YARD)IN ORDER TO PROTECT PUBLIC AND PROPERTY
Feb 5, 2020 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Dec 26, 2019 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Dec 26, 2019 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Nov 1, 2019 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM:1 STRY WD FRAMED 20' X 50' BLDG IS IN STATE OF DISREPAIR.EXP2 IS BULGING&APPEAR TO BE SEPARATING FROM STRUCT.INSIDE,MISSING SOME FLR JOIST,MISSING FLR BOARDS,UN ENGINEERED SHORING,NO CEILING.GAR IN REAR YARD IN NEED OF REPRS.OWNR RETAIN PE EVAL BLDG,FILE PLANS WITH DOB AND PERMIT NO LATER THAN 11/15/19.REPR WORK START NO LATER THAN 12/15/19
Nov 1, 2019 V%-DOB VIOLATION UB-UNSAFE BUILDINGS NONE UB-UNSAFE BUILDINGS NONE