Queens Corona
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
7 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 30, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILRE 2 MAINTAIN PROPERTY IN SAFE/CODE-COMPLIANT MANNER. 2-STORY WOOD -FRAMD BLDG DESTABILZD BY PARTIAL DEMO,EXCAVATION, INTERIOR DEMO FOR REAR ADDITION. TEMP STABILIZATN DONE,NON-COMPLIANT ELEMENTS REMAIN REMEDY: FAILURE TO COMPLY W COMMISSIONER'S ORDER IN VIOLATION # 061424CE40401PT. COMPLY W CODE & ALL REQUIREMENTS OF PREVIOUS ORDER |
| Sep 30, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | 2-STORY WOOD FRAMD BLDG DESTABILZD BY: PART. DEMO OF EXP.#3,EXCAVATION AND INT. DEMO FOR PROPOSED REAR ADD'N. SITE TEMP STABILZED UNDER EMERGENCY WORK, WITH NON-COMPLIANT ELEMENTS REMAINING.REMEDY: FAILURE TO COMPLY W. COMMISSIONER'S ORDER IN VIOLATION # 051324CE40401PT COMPLY W CODE & ALL REQUIREMENTS OF PREVIOUS ORDR BY 11/1/25 |
| Jun 14, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILRE 2 MAINTAIN PROPERTY IN SAFE/CODE-COMPLIANT MANNER. 2-STORY WOOD -FRAMD BLDG DESTABILZD BY PARTIAL DEMO,EXCAVATION,INTERIOR DEMO FOR REAR ADDITION. TEMP STABILIZATION DONE, NON-COMPLIANT ELEMENTS REMAIN REMEDY: COMPLY W CODE, INSPECT MONTHLY FOR STRUCTURAL CHANGES 'TIL COMPLIANT PER #051324CE40401PT.REPORTS BY NYS PE,NOTIFY OF MOVEMENT |
| May 13, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | 2-STORY WOOD FRAMD BLDG DESTABILIZD BY:PART.DEMO OF EXP#3,EXCAVATION, AND INT.DEMO FOR PROPOSED REAR ADD'N.SITE TEMP STABILIZED UNDR EMERGENCY WORK,WITH NON-COMPLIANT ELEMENTS REMAINING.COMPLY W/CODE RETAIN NYS PE,LIC.GC 2 BRING SITE&BLDG INTO COMPLIANCE.COMPLETE PERMIT WORK & SIGN-OFF BY 6/01/25 |
| Dec 26, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK: 2-STORY WOOD-FRAMED BLDG STRUCTURALLY COMPROMISED, EXP #3 & 4 WALLS UNSTABLE. INADEQUATE SHORING, EXCAVATION,DESTABILIZED FOU NDATION. REMEDY: RETAIN NYS PE, GC&CS 2 STABILIZE BLDG. WRK MUST STRT BY 12PM ON 12/27/23. FAIL TO COMPLY AUTHORIZES HPD TO PERFORM WORK |
| Dec 14, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN SAFE PROPERTY, 2-STORY WOOD BLDG DESTABILIZED BY ADDITION WORK: PARTIAL DEMO, EXCAVATION, INTERIOR DEMO. REMEDY: COMPLY W CODE, NYS PE TO EVAL SITE & GIVE RPT BY 12/19/23. IDENTIFY HA ZARDS, ADJOINING PROPS & PUBLIC. PROPOSED RESOLUTION,BIWEKLY STABLITY INSPECTION RPTS REQ.'TIL WRK STARTS |
| Aug 9, 2017 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |