Queens Ozone Park
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 8, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AN INSPECTION REVEALED THE INSTALLATION OF NEW PVC DRAINAGE PIPES AT EXPOSURE THREE FOR RAINWATER DRAINAGE. IT WAS NOTED THAT THIS WORK WAS CARRIED OUT WITHOUT THE REQUIRED PERMIT. |
| Oct 8, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | DURING THE INSPECTION, IT WAS NOTED THAT ELECTRICAL WORK WAS PERFORMED WITHOUT THE NECESSARY PERMIT. ADDITIONALLY, BX CORDS WERE OBSERVED PROTRUDING FROM EXPOSURES 123 AND 4. THIS SITUATION RAISES CONCERNS REGARDING COMPLIANCE WITH SAFETY |
| Oct 8, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AN INSPECTION REVEALED THE REMOVAL OF A DECK AT THE SPECIFIED LOCATION EXPOSURE THREE ALSO OBSERVED INSTALLING A NEW DECK. IT WAS NOTED THAT THIS WORK WAS CONDUCTED WITHOUT A PERMIT ON FILE, INDICATING A POTENTIAL VIOLATION OF REGULATIONS |