Queens Richmond Hill
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
7 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Feb 16, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN COMM BLDG.1 STORY MASONRY WALLS,WOOD FLS SEVERELY DMGD BY FIRE- 02/14/21.DMG FOUND @ ROOF FRMG,SEVERE DMG NOTED TRU-OUT 1FL INTERIOR,WATER DAMAGE AT CELLAR.STORE FRONT AND FRNT WALL MISSING OWNER TO ENGAGE NYS PE AND CONTRACTOR TO REPAIR BUILDING UNDER PERMIT FILE FOR PERMIT BY 04/01/2021.START WORK BY 05/01/2021 |
| Feb 16, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK:ONE STORY AND CELLAR MASONRY WALLS,WOOD FRAMED FLOORS- COMMERICAL BUILDING- DAMAGED BY FIRE ON 2/14/21.ROOF SEVERLY DAMAGED AT SOUTH EAST CORNER.THERE IS POTENTIAL OF ROOF COLLAPSE.IMMEDIATELY INSTALL TEMP SHORING,@SOUTH EAST CORNR UNDR DIRCT CONTINUOUS SUPERV OF PE AND REMOVE DEBRIS IN COORD W/FDNY.FILE PRMT W/IN 48 HRS WORK START |
| Feb 16, 2021 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | SEAL UP BUILDING AT FRONT AND REAR EXPOSURE (EXP#1 ) IN ADDITION PROVIDE A TIGHT BOARD CONSTRUCTION AT EXP#1.CONSTRUCTION FENCE TO EXTEND THE FULL LENGTH OF STORE ON EXPOSURE#1. APPROX.40 FT X8 FT HIGH TO PROTECT THE PUBLIC AND PROPERTY |
| Oct 5, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 2, 2013 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 20, 1990 | VP*-VIOLATION UNSERVED ECB- DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | MM |
| Oct 14, 1988 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | J |