Queens Douglaston-Little Neck
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 26, 2019 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 26, 2019 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 26, 2019 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 12, 2019 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK. OWNER IS DIRECTED TO IMMEDIATELY PROCEED WITH THE FULL REPLACEMENT INCLUDING FULL DEMOLITION OF THE DEFECTED RETAINING WALL LOCATED ALON THE COMMON PROPERTY LINE WITH 14 CHERRY STREET DEMOLITION AND STRUCTURAL DRAWINGS TO BE SUBMITTED TO THE R/W UNIT NO LATER THAN MARCH 20, 2019 WORK TO COMMENCE TO LATER THAN APRIL 8, 2019 |
| Mar 12, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK. OWNER IS DIRECTED TO IMMEDIATELY PROCEED WITH THE EMERGENCY STABILIZATION OF THE RETAINING WALL LOCATED ALON THE COMMON PROPERTY LINE WITH 14 CHERRY STREET. EMERGENCY STABILIZATION TO PROCEED BASED PN SIGNED PE DRAWINGS. EMERGENCY WORK TO COMMENCE IMMED AND TO BE COMPLETED NO LATER THAN MARCH 19, 2019 |