NYC Building Report

Manhattan Chinatown-Two Bridges

BIN 1090005

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

411 records

Date Status Type Summary
Sep 8, 1988 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED (03)REPAIR GLASS WHERE NEEDED.(34)RENEW SADDLE.(51)REPLACE CAB RAILING
Sep 8, 1988 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED (03)REPAIR GLASS WHERE NEEDED.(34)RENEW SADDLES.(47)PERMANENTLY WIRE LIGHT SWITCH.(51)REPLACE CAB RAILING
Sep 8, 1988 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED (03)REPAIR GLASS WHERE NEEDED.(51)REPLACE CAB RAILING
Sep 8, 1988 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED (03)REPAIR GLASS WHERE NEEDED.(51)REPAIR CAR FLOOR.(52)REPLACE CAB RAILING
Sep 8, 1988 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED (03)REPAIR GLASS WHERE NEEDED.(47)PERMANENTLY WIRE LIGHT SWITCH (51)REPLACE CAB RAILING
Sep 7, 1988 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED (03)REPAIR GLASS WHERE NECESSARY (51) REPLACE CAB RAIL
Sep 7, 1988 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED (51)REPLACE CAB RAIL (03)REPAIR GLASS WHERE NECESSARY
Sep 6, 1988 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED (51)REPLACE CAB RAILING
Sep 6, 1988 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED (51)REPLACE CAB RAILING
Sep 2, 1988 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED (03)REPAIR BROKEN GLASS WHERE NECESSARY.(51)REPLACE MISSING CAB RAIL
Jun 3, 1988 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED (51)REPAIR CAB WALLS FREIGHT CAR (ROTTING AWAY AT BOTTOM