Manhattan Lower East Side
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Feb 23, 2024 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: PROVIDE APPROXIMATLEY 30' LINEAR FEET OF SIDEWALK SHED ALONG EXPOSURE #1TO ENCLOSE THE POTENTIAL COLLAPSE ZONE AND SAFEGUARD THE PU BLIC AND PROPERTY |
| Feb 23, 2024 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL |
| Feb 22, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | BUILDING FACADE IN STATE OF DISREPAIR WITH MULTIPLE STEP CRACKS THROUGHOUT VARIOUS ELEVATION OF EXPOSURE # 1. ALSO NOTED A BULGING SECTION OF BRICKS OF APPROXIMATELY 2'X4' FEET AREA BETWEEN 2ND AND 3RD STORY WINDOW WITH THE POTENTIAL OF COLLAPSING. |
| Aug 26, 2015 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 14, 2011 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |