950 East 4 Walk, Manhattan

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

143 records

Date Status Type Summary
May 7, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED SPALLED BRICKWORK ON EXPOSURES 1 AND 4 (EAST AND NORTH ELEVATIONS) IN MULTIPLE LOCATIONS. REMEDY: REPAIR AND/OR REPLACE
May 7, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED SPALLED BRICK WORK IN MULTIPLE LOCATIONS ON EXPOSURES 1 AND 4 (EAST AND NORTH ELEVATION.) REMEDY: REPAIR AND/OR REPLACE
Jul 22, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURAL RENDERED NON-COMPLIANT DUE TO VEHICLE IMPACT TO SIDEWALK SHED DISLODGING APPROX. 20 LN. FT.
Feb 22, 2022 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Feb 22, 2022 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Feb 22, 2022 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Feb 22, 2022 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Feb 22, 2022 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Feb 22, 2022 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Feb 22, 2022 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Feb 22, 2022 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Feb 22, 2022 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Feb 22, 2022 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Feb 22, 2022 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Feb 22, 2022 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Feb 22, 2022 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Feb 22, 2022 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Feb 22, 2022 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Feb 22, 2022 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Jul 21, 2021 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO THE SIDEWALK SHED DUE TO VAN IMPACTING THE SIDEEALK SHED AT 30 AVENUE D
Jan 22, 2020 V-DOB VIOLATION - ACTIVE FISP-FACADE SAFETY PROGRAM FACADE REQUIRED FISP-FACADE SAFETY PROGRAM FACADE REQUIRED
Jan 22, 2020 V-DOB VIOLATION - ACTIVE FISP-FACADE SAFETY PROGRAM FACADE REQUIRED FISP-FACADE SAFETY PROGRAM FACADE REQUIRED
Jan 15, 2020 V-DOB VIOLATION - ACTIVE FISP-FACADE SAFETY PROGRAM FACADE REQUIRED FISP-FACADE SAFETY PROGRAM FACADE REQUIRED
Jan 15, 2020 V-DOB VIOLATION - ACTIVE FISP-FACADE SAFETY PROGRAM FACADE REQUIRED FISP-FACADE SAFETY PROGRAM FACADE REQUIRED
Jan 15, 2020 V-DOB VIOLATION - ACTIVE FISP-FACADE SAFETY PROGRAM FACADE REQUIRED FISP-FACADE SAFETY PROGRAM FACADE REQUIRED
Jan 15, 2020 V-DOB VIOLATION - ACTIVE FISP-FACADE SAFETY PROGRAM FACADE REQUIRED FISP-FACADE SAFETY PROGRAM FACADE REQUIRED
Jan 14, 2020 V-DOB VIOLATION - ACTIVE FISP-FACADE SAFETY PROGRAM FACADE REQUIRED FISP-FACADE SAFETY PROGRAM FACADE REQUIRED
Jan 14, 2020 V-DOB VIOLATION - ACTIVE FISP-FACADE SAFETY PROGRAM FACADE REQUIRED FISP-FACADE SAFETY PROGRAM FACADE REQUIRED
Jan 14, 2020 V-DOB VIOLATION - ACTIVE FISP-FACADE SAFETY PROGRAM FACADE REQUIRED FISP-FACADE SAFETY PROGRAM FACADE REQUIRED
Dec 12, 2019 V-DOB VIOLATION - ACTIVE FISP-FACADE SAFETY PROGRAM FACADE REQUIRED FISP-FACADE SAFETY PROGRAM FACADE REQUIRED
Sep 6, 2019 V*-DOB VIOLATION - DISMISSED ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST
Sep 6, 2019 V*-DOB VIOLATION - DISMISSED ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST
Sep 6, 2019 V*-DOB VIOLATION - DISMISSED ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST
Sep 6, 2019 V*-DOB VIOLATION - DISMISSED ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST
May 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
May 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
May 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
May 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
May 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
May 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
May 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
May 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
May 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
May 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
May 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST