Manhattan East Village
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
143 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 7, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED SPALLED BRICKWORK ON EXPOSURES 1 AND 4 (EAST AND NORTH ELEVATIONS) IN MULTIPLE LOCATIONS. REMEDY: REPAIR AND/OR REPLACE |
| May 7, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED SPALLED BRICK WORK IN MULTIPLE LOCATIONS ON EXPOSURES 1 AND 4 (EAST AND NORTH ELEVATION.) REMEDY: REPAIR AND/OR REPLACE |
| Jul 22, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURAL RENDERED NON-COMPLIANT DUE TO VEHICLE IMPACT TO SIDEWALK SHED DISLODGING APPROX. 20 LN. FT. |
| Feb 22, 2022 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Jul 21, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO THE SIDEWALK SHED DUE TO VAN IMPACTING THE SIDEEALK SHED AT 30 AVENUE D |
| Jan 22, 2020 | V-DOB VIOLATION - ACTIVE | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED |
| Jan 22, 2020 | V-DOB VIOLATION - ACTIVE | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED |
| Jan 15, 2020 | V-DOB VIOLATION - ACTIVE | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED |
| Jan 15, 2020 | V-DOB VIOLATION - ACTIVE | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED |
| Jan 15, 2020 | V-DOB VIOLATION - ACTIVE | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED |
| Jan 15, 2020 | V-DOB VIOLATION - ACTIVE | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED |
| Jan 14, 2020 | V-DOB VIOLATION - ACTIVE | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED |
| Jan 14, 2020 | V-DOB VIOLATION - ACTIVE | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED |
| Jan 14, 2020 | V-DOB VIOLATION - ACTIVE | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED |
| Dec 12, 2019 | V-DOB VIOLATION - ACTIVE | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST |
| May 31, 2018 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 |
| May 31, 2018 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 |
| May 31, 2018 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 |
| May 31, 2018 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 |
| May 31, 2018 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 |
| May 31, 2018 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 |
| May 31, 2018 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 |
| May 31, 2018 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 |
| May 31, 2018 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 |
| May 31, 2018 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 |
| May 31, 2018 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 |
| Jan 26, 2018 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST |
| Jan 26, 2018 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST |
| Jan 26, 2018 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST |
| Jan 26, 2018 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST |
| Jan 26, 2018 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST |