NYC Building Report

Manhattan Chinatown-Two Bridges

94 East Broadway, Manhattan

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

4 records

Date Status Type Summary
Jul 3, 2018 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERG WRK ORDER.PREM IS MIX USE,6S+CELL BLDG,COMM AT 1ST,RESID ABOVE AT FRONT FACADE A STONE LINTEL FALL INTO SIDEWALK FROM 4THFL WINDOWS LOOSE DEBRIS&BRICKS STILL AT FRONT FACADE&RISK OF FURTHER COLL.REMEDY: OWN IMMED INSTALL SW SHED AT FRONT OF BLDG.WRK START NO LATER 7/3/18 WRK FILED W/48HRS OF COMMENCE OF WRK.OBT PERM NO LATER 7/6/18
Jul 3, 2018 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM BLDG.PER INSPECT BY M.FRIAS PE ON 7/3/18 STORE LINTEL FELL FROM ABOVE EXP1,4THFL WINDOWS&KNOCKED DOWN COMM AWNING @1STFL.REMEDY:PER DISCUSSION BET OWN&M.FRIAS ON 7/3/18,OWN RET LIC PROF ENG'R OR ARCH TO EVAL EXP 1 FACADE&DEVELOP COMPREHENSIVE RPR PLANS.FILE PLANS&OBT PERM BY 8/6/18.BEG WRK BY 8/27/18.COMP WRK BY 11/30/18
Dec 31, 2009 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
Dec 31, 2009 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED