Manhattan Chinatown-Two Bridges
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
25 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Feb 22, 2022 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Jan 6, 2020 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL APPROXIMATELY 26 LINEAR FEET SIDEWALK SHED ALONG BAXTER STREET |
| Jan 6, 2020 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL APPROXIMATELY 26 LINEAR FEET SIDEWALK SHED ALONG BAXTER STREET |
| Apr 6, 2018 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Apr 6, 2018 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Apr 6, 2018 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Oct 21, 2015 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 15, 2015 | V-DOB VIOLATION - ACTIVE | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED |
| Jun 15, 2015 | V-DOB VIOLATION - ACTIVE | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED |
| May 15, 2014 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| May 15, 2014 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| May 15, 2014 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| Jan 15, 2014 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jul 15, 2010 | V*-DOB VIOLATION - DISMISSED | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL |
| Jul 15, 2010 | V*-DOB VIOLATION - DISMISSED | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL |
| Jul 15, 2010 | V*-DOB VIOLATION - DISMISSED | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL |
| Jul 15, 2010 | V*-DOB VIOLATION - DISMISSED | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL |
| Nov 30, 2007 | V-DOB VIOLATION - ACTIVE | LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL |
| Nov 30, 2007 | V-DOB VIOLATION - ACTIVE | LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL |
| Aug 8, 2002 | V*-DOB VIOLATION - DISMISSED | L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED | L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED |
| Mar 30, 1990 | V-DOB VIOLATION - ACTIVE | ES-ELECTRIC SIGNS NONE | ES-ELECTRIC SIGNS NONE |