Manhattan East Harlem (South)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
15 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Feb 14, 2023 | V*-DOB VIOLATION - DISMISSED | EGNCY-EMERGENCY NONE | EXTEND EXISTING SIDEWALK SHED 5 FEET INTO ADJACENT PROPERTIES TO SAFEGUARD THE PUBLIC |
| Feb 6, 2023 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REPAIR SIDEWALK SHED AT EXPOSURE#1 APPROXIMATELY 45 LINEAR FEET TO SAFEGUARD THE PUBLIC |
| Sep 2, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Feb 13, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM:EXTERIOR WALLS ARE IN STATE OF DISREPAIR AT FRONT CRACKS NOTED AT PARAPET AND CORNER WITH EAST WALL@ALL FLOORS.CRACKS NOTED AT EAST YARD SLAB ON GRADE&EXTERIORR WALL@2ND,3&4TH FLR.SOME CRACKS NOTED@INTERIOR SEPARATION NOTED@WEST WALL.OWNER TO ENGAGE PE&CONTRCT TO MONITOR BLDG AND REPR UNDER PERMIT.FILE FOR PERMIT BY 3/9/20.START WORK BY 4/1/20 |
| Feb 7, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED CRACKS BOTH VERTICAL AND HORIZONTAL IN MULTIPLE UNITS THROUGHOUT BUILDING. CRACKS NOTED IN UNITS #27, 25, 20, 10 AND #5. ADJACENT CONSTRUCTION SITE AT 94 EAST 111TH STREET HAS CRACK MONITORING IN PLACE. |
| Jan 24, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Dec 17, 2019 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | PROVIDE APPROX. 35 LINEAR FEET OF SIDEWALK SHED @ EXP#1 TO SAFEGUARD PUBLIC AND PROPERTY |
| Dec 15, 2019 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AT TIME OF INSPECTION OBSERVED CRACKS AT EXPOSURE #1 WALL ACTIVE PROPOSED 12 STORY NB AT EXPOSURE # 2 |
| Feb 13, 2004 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| May 21, 2003 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| May 4, 1998 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 29, 1995 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Sep 1, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |