NYC Building Report

Manhattan Upper East Side-Carnegie Hill

872 Lexington Avenue, Manhattan

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

36 records

Date Status Type Summary
Jun 27, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL UNPERM'D ALT LEFT 5-STRY LPC BLDG W/ WOOD/STEEL FL FRAMING +MASONRY WALLS W/WEAKENED/HAZARDOUS GRAVITY/LATERAL SYSTEM,UNBRACED.WALLS.6/27/ 25 MONITORING PLAN (J. LIEBER, PE), RECS VISUAL/OPTICAL MONITORNG REMEDY: COMPLY W/ CODE & MONITORING PLAN. OPTICAL READING + MONTHLY INSP. NYS PE TO REPORT; MAKE AVAIL TO DOB ON REQUEST
Jun 27, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL UNPERM'D ALT LEFT 5-STRY LPC BLDG W/ WOOD/STEEL FL FRAMING + MASONRY WALLS W. WEAKENED/HAZARDOUS GRAVITY/LATERAL SYSTEM, UNBRACED WALLS PREVIOUS RDP WITHDREW STABIL. APP UNDER #052924CE10802PT. REMEDY: COMPLY W/ CODE. HIRE RDP 2 STABILIZE/REPAIR/BRACE.FILE DRWGS + START WORK UNDER PERMIT BY 9/30/25. GET REQ'D APPRVLS
Apr 16, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EOR G. CAMBOURAKIS,PE,FAILED TO ADDRESS UNCORRECTED FIELD ISSUES ID'D BY SIA RPT,INDARDEO PARBHUNATH,PE,ON 02/19/25. NO RESPONSE OR REMEDIAL PLAN TO DATE. REMEDY:COMPLY W CODE. NYS REGISTERED DESIGN PROFESSIONAL TO ADDRESS SIA FIELD ISSUES & SUBMIT REMEDIAL PLAN TO DOB BY 4/30/25
Jul 24, 2024 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jul 18, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL UNPERMITED ALTERATIONS COMPROMISD 5-STORY LANDMARKD BLDG W. WOOD/STEEL FL FRAMING+MASONRY WALLS.HAZARDS:COMPROMISD LATERAL SYSTEM,UNSTIFFENED JOIST HANGERS,INADEQUATE BLOCKING,QUESTIONABLE GRAVITY SUPORT,UNBRACED WALLS. REMEDY: FAILURE TO COMPLY W COMMISSIONER'S ORDR 052924CE10801PT COMPLY W ORDR BY 8/17/24
May 29, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL UNPERMITD ALTERATIONS COMPROMISD 5-STORY LANDMARKED BLDG W/WOOD/STEEL FLR FRAMNG+MASONRY WALLS.HAZARD:COMPROMISED LATERAL SYSTEM,UNSTIFND JOIST HANGERS,INADEQUATE BLOCKNG,QUESTIONBL GRAVITY SUPPORT.COMPLY W/ CODE,HIRE RDP2MAKE-SAFE&FILE DRWNGS.PROPOS MONITRNG BY 5/30.STRT WRK BY 6/28/24.OBTAIN ALL REQ'D PERMITS
May 24, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM. NOTED VERTICAL AND HORIZONTAL ENLARGEMENT OF (4) STORY, NFP, MIXED USE BUILDING WITH THE ADDITION OF A 5TH FLOOR AND REMOVAL OF PARTY WALLS SHARED WITH PROPERTY 135 EAST 65TH STREET COMPROMISING FIRE RATED ASSEMBLIES AND IN CONJUNCTION WITH NONENGINEERED STRUCTURAL FRAMING THROUGHOUT BUILDING HAS RENDERED BUILDING UNSAFE TO OCCUPY.
May 22, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL BUILDING DEPT RECORDS IDENTIFY PROPERTY AS (4) STORY, CLASS III, MIXED USE OCCUPANCY WITH DWELLING UNITS ON 3RD AND 4TH FLOORS. AT TIME OF INSPECTION 5TH FLOOR IS NOW PRESENT AND BUILDING IS ACTIVELY BEING MERGED WITH ADJACENT PROPERTY 135 EAST 65TH STREET WITH STRUCTURAL FRAMING IN PLACE AND EXTERIOR WALLS REMOVED.
Jun 30, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Apr 25, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
Nov 8, 2019 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Jun 14, 2019 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Nov 5, 2018 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL THE BOROUGH COMMISSIONER HAS ISSUED A STOP WORK ORDER UNDER JOB #10442 3045 DUE TO APPLICANT WITHDRAWAL. UNABLE TO DETERMINE % WORK COMPLETED
Apr 6, 2018 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Feb 24, 2017 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Oct 1, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
Mar 3, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
May 21, 2014 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
May 15, 2014 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Mar 1, 2013 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
Dec 13, 2011 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Dec 31, 2009 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
Sep 21, 2009 V*-DOB VIOLATION - DISMISSED LANDMK-LANDMARK NONE LANDMK-LANDMARK NONE
Sep 21, 2009 V-DOB VIOLATION - ACTIVE LANDMK-LANDMARK NONE LANDMK-LANDMARK NONE
Jan 1, 2009 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jan 3, 2008 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Apr 1, 2002 V*-DOB VIOLATION - DISMISSED LANDMK-LANDMARK NONE LANDMK-LANDMARK NONE
Apr 1, 2002 V*-DOB VIOLATION - DISMISSED LANDMK-LANDMARK NONE LANDMK-LANDMARK NONE
Feb 11, 2002 V*-DOB VIOLATION - DISMISSED LANDMK-LANDMARK NONE LANDMK-LANDMARK NONE
Feb 11, 2002 V*-DOB VIOLATION - DISMISSED LANDMK-LANDMARK NONE LANDMK-LANDMARK NONE
Feb 11, 2002 V*-DOB VIOLATION - DISMISSED LANDMK-LANDMARK NONE LANDMK-LANDMARK NONE
Jul 3, 1999 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
May 4, 1998 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jun 20, 1997 V*-DOB VIOLATION - DISMISSED LANDMRK-LANDMARK NONE LANDMRK-LANDMARK NONE