Manhattan Midtown-Times Square
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
94 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Feb 27, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER DUE TO LOOSE/DISPLACE CEILING TILES OVER PUBLIC ENTRANCE & EXIT TO THE SUBWAY @ EXPOSURE #2 NORTH ELEVATION CONDITIONS HAZARDOUS TO THE PUBLIC. REMEDY: IMMEDIATELY REMOVE OR REPLACE THOSE CEILING TILES FOR PROTECTION |
| Feb 27, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER:OBSERVED DEFECTED CONDITIONS: CRACKS & DEFECTED WINDOW FRAMES, MISSING BRICKS @ EXPOSURE 1. CRACK PANE & CRACK CORNICE AT EXPOSURE 2. EXPOSURE 3 CRACK PANE, VERTICLE CRACK SOUTH EAST LOWER FLOOR. EXPOSURE 3, MISSING BRICK CRACK STONES. REMEDY: REPAIR AND/OR REPLACE |
| Sep 19, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER EXP #1 & 4 WEST& SOUTH ELEV BRICKS WERE REMOVED BUT THERE WERE NO WORK MEN AT WORK. EXP 1 WEST ELEV LOOSECORROGATED GALVANIZE AT PARAPET. EXP #3 EAST ELEVATIO MULTIPLE CRACKS IN MASONRY,FLOWER BOXES SITTING ON SEVERAL WINDOW SILL REMEDY: REPAIR AND/OR REPLACE ALL DAMAGED FACADE AND APPURTANCES |
| Jun 23, 2024 | V-DOB VIOLATION - ACTIVE | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023) |
| May 3, 2024 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Feb 12, 2024 | V-DOB VIOLATION - ACTIVE | FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED | CYCLE 9B UNSAFE REPORT FILED |
| Dec 26, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN A CODE COMPLAINT MANNER AT THE INSPECTION ED CONDITION ON MULTIPL EXPOSURE THAT DAMAGE REMEDY: FIX OR REPLACE |
| May 15, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.OBSERVED CRACK ON EXPOSURE 1&2 MISSING/DAMAGED MORTAR JOINTS ON EXPOSURE#1 REMEDY: REPAIR AND/OR REPLACE |
| Apr 22, 2023 | V-DOB VIOLATION - ACTIVE | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022) |
| Feb 22, 2023 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 |
| Feb 6, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM EXTERIOR BLDG FACADE AND APPURTENANCES, LOOSE BRICKS, SPALLING, DAMAGED WINDOW FRAMES AND DAMAGED ROOF OBSERVED ON EXP1 WEST ELEV VERTICAL CRACK OBSERVED ON EXP3 EAST ELEV, DMAGED WINDOW FRAME AND CRAKCED SILL ON EXP2 NORTH ELEV. REMEDY: MAINTAIN EXTERIOR BLDG FACADE AND REPAIR DAMAGED FACADE |
| Feb 2, 2023 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Oct 13, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG IN CODE COMPLIANT MANNER. LOOSE BRICKS, SPALLING, DAMAGED WINDOW FRAMES AND DAMAGED ROOF OBSERVED ON EXP1 WEST ELEV. VERTICAL CRACK OBSERVED ON EXP3 EAST ELEVATION. REMEDY: MAINTAIN BLDG IN CODE COMPLIANT MANNER |
| Aug 21, 2022 | V-DOB VIOLATION - ACTIVE | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021) |
| Oct 11, 2021 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Oct 11, 2021 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Oct 11, 2021 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jun 20, 2021 | V-DOB VIOLATION - ACTIVE | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2020) |
| Jun 19, 2021 | V-DOB VIOLATION - ACTIVE | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2019) |
| Oct 2, 2020 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Oct 2, 2020 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Feb 19, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 9, 2019 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Sep 9, 2019 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Sep 9, 2019 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Sep 9, 2019 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Sep 9, 2019 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| May 2, 2019 | V-DOB VIOLATION - ACTIVE | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Mar 18, 2019 | V-DOB VIOLATION - ACTIVE | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2018) |
| Feb 15, 2019 | V-DOB VIOLATION - ACTIVE | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED |
| Jul 31, 2018 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018 |
| Mar 27, 2018 | V*-DOB VIOLATION - DISMISSED | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2017 |
| Jan 26, 2018 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST |
| Jan 26, 2018 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST |
| Jan 26, 2018 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST |
| Sep 28, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Sep 28, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Sep 28, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Nov 14, 2016 | V-DOB VIOLATION - ACTIVE | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST |
| Nov 14, 2016 | V-DOB VIOLATION - ACTIVE | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST |
| Nov 14, 2016 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST |
| Aug 2, 2016 | V-DOB VIOLATION - ACTIVE | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Jun 2, 2016 | V-DOB VIOLATION - ACTIVE | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Mar 3, 2015 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT |
| Sep 24, 2014 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Apr 24, 2014 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 30, 2014 | V-DOB VIOLATION - ACTIVE | P-PLUMBING NONE | NEW SHOWER BODIES AND HOT AND COLD DOMESTIC WATER LINES FOR 2 SHOWERS 2 TOILETS AND 2 LAVATORIES IN 2 BATHROOMS INSTALLED IN APT #12C WITH OUT A PERMIT. PARTIAL STOP WORK ORDER POSTED FOR APT #12C ONLY REMEDY: OBTAIN PERMIT |
| Jan 29, 2014 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 30, 2013 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 |
| May 23, 2013 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |