Manhattan Chinatown-Two Bridges
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
17 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 19, 2018 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 11, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERG WRK.BLDG IS 5 STRY MIX USE BLDG.PER T.THOMASETTI RPTS 2/20- 23/2018&SKETCHES/DWGS,NUMBER OF FLR JOIST AT 3RD,4TH,5TH FLRS HAVE TO BE REMOVED/REPAIRED/REPLACE UND KITCHEN/BATHROOM AREAS DUE TO DETERIOR &WILL DIMINISH JOIST LIKELY TO DESTABILIZE PW.REMEDY:OWN REMOVE/RPR/ REPLACE FL JOIST AS PER APP#123364411.WRK START NO LATER 5/14/18 |
| Apr 18, 2018 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Apr 18, 2018 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Feb 16, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | HOT WORK IN PROGRESS AT THE INTERIOR OF THE BLDG.WELDING IS TAKING PLACE AT THE PREMISES UNDER PERMIT #123204013 DURING THE CONSTRUCTION OF THE STAIR.REMEDY:MAINTAIN A FIRE WATCH TO CONTINOUSLY OBSERVE HOT WORK OPERATIONS.FIRE WATCH TO CONTINUE TO OBSERVE HOT WORK AREA FOR A MINIMUM OF 30 MINS AFTER CONCLUSION OF HOT WORK |
| Feb 15, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | 5 STRY W/CELLAR UNDERGOING CONSTRUCT/REPLACEMENT OF MAIN EGRESS STAIR PER APP#123204013+#123149681.RECENT OBSERVED RELOCATION OF SPRINKLER LINES AROUND STAIRWELL OPNGS.CONSTRUCT OF NEW FTGS OF CONC+REINF STEEL REMEDY:IMMED FILE PAA THAT INCLUDE REUSED PLANS SHOWING SPRINKLER LINE RELOCATION&CONC WRK.REEVISE/PROV NEW TR-1,TR-2&TR-3 FORMS AS NECESSARY |
| Aug 10, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 10, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 10, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 10, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 10, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 10, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 12, 2015 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 12, 2015 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jul 2, 2015 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAIL TO MAINTAIN. EMRGENCY WORK. SOME WOOD JOISTS AT SECOND FLOOR (FIRST FLOOR CEILING) WERE FOUND STRUCTUALLY DEFECTIVE. OWNER TO IMMEDIATELY PROVIDE SHORING TO DEFECTIVE SECOND FLOOR. FILE AND PERMIT WORK WITH 48 HOURS OF START OF SHORING |
| May 19, 2015 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG.1STORY REAR EXT.IS DETERIORATED & STRUCTURALY DEFECTIVE TO DMG WOOD JOIST,COMPROMISED WOOD BEAM SUPPORT @WOOD POST DMG STEEL POST @BASE.OWNER TO IMMEDAITELY SHOR & BRACE REAR EXTENSION UNDER PE SUPERVISION.SHORE & BRACE BEFORE REPAIR/REPALCEMENT OBTAIN PERMITAND START REPAIR OR REPLACEMENT NO LATER THAN 06/03/2015 |
| May 19, 2015 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN,STAIR OF BLDG IS SLOPED & PULLING FROM EXPOSURE#2 WALL AT ALL FLOORS STAIR HALLWAY IS SLOPED AT ALL FLOORS. OWNER TO IMMEDIATELY SHORE & BRACE STAIR UNDER PE SUPERVISION,FILE & REPAIR SHORE BRACE BEFORE REPAIR,OWNER TO ENGAGE PE TO EVALUTE ENTIRE BLDG OBTAIN PERMITS FOR REPAIR, START REPAIR WORK NOLATER THAN 06/03/2015 |