809 9 Avenue, Manhattan

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

13 records

Date Status Type Summary
Jun 30, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Jul 11, 2019 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON-COMPLIANCE DUE TO VEHICLE IMPACTED TO STORE FRONT OF THE RESTAURANT AND LEFT DOOR STUCK, DOES NOT OPEN.
Feb 20, 2017 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 3, 2017 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
Nov 14, 2016 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
Mar 3, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
Jun 10, 2014 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Aug 7, 2013 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jul 2, 2012 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jul 9, 2009 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL INADEQUATE DETAILS ON APPROVED PLANS FOR 1. TOP OF CELLAR SLAB - 10'6" ON STRUC. DETAILS 3/31/09 1A. TO POF CELLAR SLAB IS 9' ON ARCH ELEVAT IONS. 2. DETAIL 5/56 HAS #4 REBAR @ 24" CC. DWELLING 1ST AND 2ND FLOO R SLAB INTO EXISTING BRICK WALLS WHERE 1' SEKMIC IS REQUIRED REMEDY: AMED PLANS TO INCLUDE CURRENT, CORRECTED REQUIREMENTS
Jun 1, 2009 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL MISCELLANEOUS VOILATIONS, FAILURE TO NOTIFY D.O.B. WITHIN 24-48 HOURS OF THE START OF EXCAVATION. NOTED: PARTIAL FOUNDATION COMPLETED APPROX. 60-70 FT AT EXP. 2 AND APPROX. 100 FT. AT EXP & NONOTIFICATION STOP ALL WORK - ENTIRE SITE - GIVEN TO D.O.B REMEDY: COMPLY WITH NOTICE OF VIOLATION. OFFICIALLY NOTIFY D.O.B. BY
Jan 16, 2008 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL