Manhattan Chinatown-Two Bridges
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
38 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Nov 28, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM FACADE AND APPURTENANCES. ON 11/25/22 GLASS FACADE PANELS FAILED FROM 4TH & 5TH FLOORS AT EXP1(EAST ELV). REMEDY: OWNER TO IMMED RETAIN SERVICES OF NYS REG DESIGN PROF WITH GLASS FACADE TO INSPECT AND EVAL 100% OF ALL GLASS PANELS FROM FLOOR TO FLOOR AND CAUSE OF FAILURE FILE AND PERMIT ALL WORK SUBMIT REPORT AND REPAIR |
| Nov 25, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT DUE TO (2) TWO EXTERIOR WINDOWS VANDO RIZED AT THE 3RD/3TH FLOOR EXTERIOR EXPOSUR (1) AND FULLY REMOVE BY FD NY TO PROTECT THE BUILDING AND SIDEWALK |
| Nov 25, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT DUE TO (2) EXTERIOR WINDOWS VANDOLIZED AT THE 3RD/4TH FLOOR EXTENSION EXPOSURE (1) AND FULLY REMOVED BY FDNY TO PROTECT THE BUILDING AND SIDEWALK |
| Nov 29, 2021 | V-DOB VIOLATION - ACTIVE | FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED | CYCLE 9C UNSAFE REPORT FILED |
| Jun 9, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY. ON 7/13/2020 COMMISSIONER'S ORDER 313191 (071320CLL10301EK)WAS ISSUED TO INSPECT 100% OF ALL FACADES BY HAND TO EVAL FACADE COND. INCL GLASS WINDOW & GLASS CURTAIN WALL IMMED BY QEWI (QUALIFIED EXTERIOR WALL INSPECTOR)& TO SUBMIT FORENSIC/STRUCT REPORT AS OF 6/9/2020 OWNER HAS NOT COMPLIED.REMEDY:IMMED COMPLY W/COMM ORDER |
| May 26, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 30, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 2, 2020 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jul 13, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | OUTER GLASS OF THE DOUBLE PANE GLASS APPROX. 8FT" BY 12FT".FELL FROM 6TH FLRTO SIDEWALK.REMEDY:OWNER TO IMMEDIATELY RETAIN NYS LIC.PROF.TO TO INSPECT 100% OF ALL FACADE BY HAND.EVALUATE FACADE COND.,INCLUDING GLASS WIND.&GLASS CURTAIN WALL.PREPARE&SUBMIT FORENSIC/STRUCTURAL ENG REPT TO FACADEUNIT WITHIN 1 MO.8/13/20-EMAIL FACADES@BUILDINGS.NYC.GOV |
| Jul 6, 2020 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | ERECT APPROXIMATELY 72 FEET OF SIDEWALK SHED ALONG CATHERINE STREET T (EXPOSURE 1, RETURN ALONG CHATHAM SQUARE (EXPOSURE 4)APPROXIMATELY 80 FEET AND RETURN ALONG EAST BROADWAY (EXPOSURE 3) APPROXIMATELY 35 FEET. IN TOTAL ERECT APPROXIMATELY 187 FEET OF SIDEWALK SHED TO SAFEGUARD THE PUBLIC AND PROPERTY |
| May 22, 2018 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| May 22, 2018 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Feb 24, 2017 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT |
| Feb 24, 2017 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT |
| Feb 24, 2017 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT |
| Jun 15, 2016 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jun 15, 2016 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Mar 31, 2014 | V*-DOB VIOLATION - DISMISSED | EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED | VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST |
| Oct 1, 2012 | V*-DOB VIOLATION - DISMISSED | EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED | VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2011 INSPECTION/TEST |
| Dec 13, 2011 | V*-DOB VIOLATION - DISMISSED | EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED | VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2010 INSPECTION/TEST |
| Jan 6, 2011 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Oct 8, 2010 | V*-DOB VIOLATION - DISMISSED | VCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED | VCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED |
| Feb 25, 2010 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Feb 27, 2009 | V*-DOB VIOLATION - DISMISSED | LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL | LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL |
| Jan 22, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STOP ALL WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS NOTE D: AT TIME OF INSPECTION JOB SITE UNDER A PARTIAL SWO DOB#112608CID03S PDA AND PROVIDED PLANS FOR SHEETING AND SHORING DETAILS NO COMFORM WIT H EXISTING WORK (DEAD MAN) EXP 4 AND SLOP AT EXP 3 REMEDY: STOP ALL WORK CONFORM TO APPROVED DOCUMENTS CALL EXCAVATION UN |
| Nov 26, 2008 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | FAILURE TO PROVIDE APPROVED/ACCEPTED PLANS ON SITE AT TIME OF INSPECTI ON CONTRACTOR PERFORMING EXCAVATION SOE, PILE INSTALLATION AND NEW FOU NDATION WALLS WITHOUT PLANS ON SITE FOR SOE REMEDY:STOP ALL WORK PROVIDE PLANS |
| Nov 26, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO PROVIDE APPROVED /ACCEPTED PLANS ON SITE AT TIME OF INSPECT ION CONTRACTOR PERFORMING EXCAVATION SOE PILE INSTALLATION AND NEW FOU NDATION WALLS WITHOUT PLANSONSITE FOR SOE REMEDY: STOP ALL WORK PROVIDE PLANS |
| Mar 21, 2008 | V*-DOB VIOLATION - DISMISSED | LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL | LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL |
| Jan 3, 2008 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Apr 2, 2007 | V*-DOB VIOLATION - DISMISSED | LL10/81-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL | LL10/81-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL |
| Apr 2, 2007 | V*-DOB VIOLATION - DISMISSED | LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL | LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL |
| Jan 19, 2007 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |