DOB violations

Department of Buildings violations attached to this BIN or tax lot.

68 records

Date Status Type Summary
Oct 3, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COPLIANT MANNER. AT THE TIME OF INSPECTION, OBSERVED AT EXPOSURES 1,2,3 & 4 CRACKS THOUGHOUT THE FACADE BUT MOSTLY AT PARAPET LEVEL. ALSO AT MULTIPLE LOCATIONS CRACKED WINDOW SILLS WERE OBSERVED AT ALL EXPOSURES. REMEDY: REPAIR AND/OR REPLACE
Oct 3, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT EXP 1,2 & 3 (EAST, SOUTH & WEST ELEVATION RESPECTIVELY) SEVERE STEP CRACKS & AT PARAPET LEVEL MOSTLY & CRACKED WINDOW SILLS AT EXPOSURE 2 & 3 @ EXPOSURE 4 SOME VERTICAL CRACKS WERE OBSERVED AT PARAPET LEVEL REMEDY: REPAIR AND/OR REPLACE
May 7, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED STEP CRACKING ON EXPOSURES 1,2 AND 4 ALSO CRACKED ON EXPOSURES 1 AND 4 REPAIR AND/OR REPLACE
May 7, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED ON EX P1,2,3,4 SEVERE STEP CRACKS ON PARAPET WALLS AND SPANDRELS DAMAGED AND ERODED MORTAR JOINTS AT ALL FOUR EXPOSURES.REMEDY:REPAIR AND/OR REPLAC E ALL DAMAGED FACADE
Jan 10, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER.EXP#1 EAST ELEV CRACK.STEP CRACK AT PARAPET AREAS.VERTICAL CRACK 5 FLR NORTH & SOUTH EXPOSURE DAMAGED CONCRETE AT 1ST FL/FOUNDATION WALLS.EXP#3CRACK 5 FL AND PARAPET COURT YARD.EXPOSURE 4 MISSING BRICKS PARAPET COURTYARD REMEDY:MAINTAIN BUILDING REPAIR AND OR REPLACE
Jan 10, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK DUE TO UNSTABLE CONDITIONS @EXPOSURE 1 CRACK,STEP CRACK &BULGING@PARAPET& OTHER LOCATIONS.EXPO#2DAMAGED CONCRETE.EXPO#3 CRACKS EXPO#4MISSING BRICKS.IMMEDIATELY MAKE REPAIRS OF THOSE CONDITIONS REMEDY:MAKE REPAIRS UNDER SUPERVISION OF LINCENSED NYC PROFESSIONAL
Jan 10, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER:OBSERVED AT EXPO #1 WEST ELEV.CRACK,STEP SRACK.SPALLING AND BULGING AT MULTIPLE LOC EXP#2.CRACK& BULGING.EXP#3 DAMAGED WIND.SILL EXP#4 STEP CRACK@PARAPET ROOF CRACK AND OPEN JOINTS.REMEDY:MAINTAIN BUILDING REPAIR AND OR REPLACE
Jan 10, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER DUE TO HAZ.DETERIORATION OF BULGING FACADE AT ALL EXPOS.CRACKS,STEP CRACK,BULGING BRICKS/MASONRY,SPALLING ERODED MORTAR AND DAMAGED WINDOW SILLS.IMMEDIATELY MAKE REPAIRS OF THOSE CONDITIONS REMEDY:MORE REPAIRS UNDER SUPERVISIONS OF NYC LICENSED PROFESSIONAL
Sep 7, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN EXTERIOR BUILDING WALLS AND APPURTENANCES.AS NOTED @ THE TIME OF INSPECT.OBSERV.DEFECT.MASONRY ON EXPO#1,2,4&ROOF.DEFECTS SUCH AS CRACKS IN TENET BALCONY EXP#1OPEN MORTAR JOINTS WATERTABLE@ SEVERAL LOC.EXP#2N.ELE.BULGING CRACKS IN MASONRY@7TH.FL.LINTEL;SEVERAL CORRODED&SAGGINGMETAL LINTEL.MAINT.EXTERIOR BLDG WALLS,REPAIR FACADE
Sep 7, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN EXTERIOR BUILDING WALLS AND APPURTENANCES:AS NOTED @TIME OF INSPECTION OBSERVED EXPOSURE 1 EAST ELEVATION:CRACKS SPALLING &BULGING BRICKS@ MULTIPLE FLOOR & LOCATIONS.EXPOSURE#2 SOUTH ELEVATION BULGING CRACKED BRICKS@ 6TH FLOOR AND PARAPET.REMEDY:MAINTAIN EXTERIOR BUILDING WALLS&APPURTENANCES REPAIR DAMAGED FACADE AS PER 1RCNY-103-04
Jul 20, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAIL.TO MAINT. BLDGIN A CODE COMPLIANT MANNER. EXP#1 SPALLED BRICKS, OPEN MORTAR JOINTS,CRACKING,STEPCRACKING,CRACKED/SPALLED STONE WORK, IN SEVERAL LOC.ALSO MISSING WIND.TRIM EXP1.EXP.2&4 OPEN MORTAR JOINTS DAMAGE LINTEL,EXP#3 DAMAGED MORTAR JOINTS DAMAGE SILLS,ROOF EXP.CRACKS ON PARAPET WALL INTERIOR&EXTERIOR.REMEDY:MAINT EXTERIOR BLDG FACADE
Jul 20, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK.DUE TO SCAFFOLD LEG OUT OF PLUMB/DISPLACED OWNER IS TO IMMEDIATELY HAVE SCAFFOLD REPAIRED AND BROUGHT INTO CODE COMPLIANCE REPAIR OR REPLACE SCAFFOLD PARAPET MAKE CODE COMPLIANT
Apr 26, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL THE OCCUPIED BELOW-GROUND PARKING STRUCTURE WITH STEEL FRAMING IS OBSERVED TO HAVE MISSING FIRE PROTECTION AT THE BASE OF COLUMNS /HORIZONTAL STEEL BEAMS @ VARIOUS LOCATIONS. A VERT CRACK THROUGH A CMU WALL OBSERVED. ALSO OBSERVED A SECTION OF BRICK MISSING ON THE OUTSIDE OVER THE ENTRY WAY.
Feb 14, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM BLDG IN CODE COMPLIANT MANNER. OBSERVED AT EXP1 EAST ELEV MULTIPLE DEFECT, BULGING, CRACK/STEP CRACK SPALLING DAMAGED JOINTS. CONDITION EXIST AT EXPOSURE VIEW, SOUTH AND WEST ELEVATIONS, CRACKS DAMAGED JOINTS. REMEDY: REPAIR AND OR REPLACE
Nov 11, 2022 V-DOB VIOLATION - ACTIVE FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED CYCLE 9A UNSAFE REPORT FILED
Sep 8, 2022 V-DOB VIOLATION - ACTIVE FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED CYCLE 9A UNSAFE REPORT FILED
Aug 9, 2022 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM EXTERIOR BLDG FACADE AND APPURTENANCES. BLDG HAS DEFECTIVE MASONRY FACADE THROUGHOUT ALL EXPOSURES DEFECTIVE MASONRY INCLUDE:DAMAGED WINDOW SILLS, DAMAGED MORTAR JOINTS, STEP CRACKING, DAMAGED BRICKS ON PARAPET WALLS. SPALLING BRICKS,BULGING BRICKS,LOOSE METAL @ WINDOW REMEDY:MAINTAIN EXTERIOR BLDG FACADE.PROV APPROVED SAFETY MEASURES
Mar 16, 2022 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM EXTERIOR BLDG FACADE AND APPURTENANCES. BLDG HAS DEFECTIVE MASONRY FACADE THROUGHOUT ALL EXPOSURES, DEFECTIVE MASONRY INCLUDING DAMAGED WINDOW SILLS, DAMAGED MORTAR JOINTS, STEP CRACKING, DAMAGED BRICKS ON PARAPET WALLS, SPALLING BRICKS, BULDGING MASONRY. REMEDY: MAINTAIN EXT BLDG FACADE PROVIDE SAFETY MEASURES REPAIR DAMAGES
Feb 22, 2022 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Feb 22, 2022 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Oct 13, 2021 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jul 23, 2021 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL AT EXPOSURE 1,2,3 AND 4 FACADE HAS CRACKS AT MULTIPLE LOCATION. AT BASEMENT , PARKING LEVEL 1 AND 2 WALLS HAS CRACKS AT MULTIPLE LOCATION.
Jul 7, 2021 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Apr 29, 2021 V*-DOB VIOLATION - DISMISSED EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
Dec 13, 2019 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Dec 11, 2019 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Oct 30, 2019 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Sep 25, 2019 V*-DOB VIOLATION - DISMISSED EGNCY-EMERGENCY NONE PROVIDE APPROX.20LF X 40LF OF SIDEWALK SHED @EXP#2,PROVIDE APPROX.20LF X 45LF OF SIDEWALK SHED @EXP#3, AND PROVIDE APPROX.20LF X 40LF OF SIDEWALK SHED @EXP#4
Sep 10, 2019 V*-DOB VIOLATION - DISMISSED EGNCY-EMERGENCY NONE ERECT APPROX. 60 LINEAR FEET OF SIDEWALK SHED ALONG EXP#1
Dec 10, 2018 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Aug 23, 2018 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL .DUE TO VEHICLE STRIKING SIDEWALK SHED
May 31, 2018 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
Apr 18, 2018 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Mar 7, 2018 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Mar 7, 2018 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jan 18, 2018 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL OWNER FAILED TO SUBMIT ACCEPTABLE 6&7 CYCLES EXTERIOR WALLS AND APPURTENANCE CRITICAL EXAMINATION TECHNICAL REPORT FILED BY A REGISTER DESIGN PROF.AS REQ'D BY AC28-302 & DOB RULES AND REGULATIONS.REMEDY: SUBMIT ACCEPTABLE EXTERIOR WALLS & APPURTENANCE CRITICAL EXAMINATION TECHNICAL REPORT BY REGISTERED PROFESSIONAL TO DEPT OF BUILDINGS IMMED
Jan 10, 2018 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL EMERG WRK.6 STORY MULT DWELL SUFFERED FIRE 1/8/18&SUSTAIN DAMAGE MOST TO "B"WING.50% OF ROOF BURN&COLL ON 6THFL.REMAIN OF ROOF SEVERELY BURN WATER DAMAGE&COLL CEILING,PLASTER THRUOUT.REMEDY:OWN IMMED INSTALL SIDEWALK SHED AT REAR TO PROT ACCESS TO GARAGE.PART DEMO/BRACE PERIM WALLS ABOVE 6THFL.FILE PERM W/48HRS OF WORK COMMENCING
Jan 10, 2018 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM BLDG.6 STORY+CELLAR MULT DWELL W/MASONRY WALLS BLDG SUSTAIN DAMAGE DUE TO FIRE 1/8/18.ROOF OF "B"WING PART COLL.WATER DAMAGE&COLL CEILING PLASTER FOUND THRUOUT.DEBRIS&MISSING/BROKEN WINDOWS FOUND THRUOUT REMEDY:OWN ENGAGE NYS PE&LIC CONT'R EVAL BLDG&PREP RPR PLANS&DETAILS FILE PERM FOR RPRS NO LATER 1/26/18.START WORK NO LATER 2/1/18
Jan 9, 2018 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL EMERG WRK."A" WING OF 6 STORY+CELLAR MASONRY BLDG SUSTAIN FIRE DAMAGE 1/8/18.WATER DAMAGE&DEBRIS FOUND THRUOUT AT ALL FLRS.FALLEN CEILING PLASTER&MISSING WINDOWS FOUND AT SOME APTS.HOLE ON ROOF FOUND AT APT 6K.REMEDY:OWN IMMED CLEAN UP WATER DAMAGE.RPR BROKEN/MISSING WINDOWS PROV 2 FIRE GUARDS FOR "A"WING.RPR HOLE ON ROOF AT APT 6K
Jan 8, 2018 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL DUE TO FIRE
Dec 6, 2017 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
May 13, 2017 V*-DOB VIOLATION - DISMISSED P-PLUMBING NONE THE DOB HAS ISSUED A 15 DAY LETTER OF INTENT TO REVOKE ALL PLUMBING APPROVALS AND PERMITS UNDER APPLICATION #122941790 DUE TO AUDIT OBJECTIONS. STOP ALL WORK IMMEDIATELY EXCEPT TO MAKE SITE SAFE
Jan 3, 2017 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
Jun 2, 2016 V*-DOB VIOLATION - DISMISSED BENCH-FAILURE TO BENCHMARK NONE FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
May 30, 2014 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
May 30, 2014 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
Nov 20, 2013 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 31, 2013 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012
Apr 11, 2012 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Feb 1, 2011 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED