NYC Building Report

Manhattan Lower East Side

73 Orchard Street, Manhattan

HPD violations

Housing Maintenance Code violations are filed by tax lot (BBL 1-00413-0050), so they can include other buildings on the same lot.

243 records

Date Class Status Apartment Summary
May 10, 2023 B NOV SENT OUT 8 § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRES AT THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
May 10, 2023 A NOV SENT OUT 8 § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS IN THE 1st ROOM FROM EAST LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
May 10, 2023 B NOV SENT OUT 8 § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE NORTH WALL, WEST WALL, EAST WALL AND SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
May 10, 2023 C NOV SENT OUT 8 § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
May 10, 2023 B NOV SENT OUT 8 § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
May 10, 2023 B NOV SENT OUT Not available § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF CONSTRUCTION MATERIALS AT PUBLIC HALL, 5th STORY
May 10, 2023 A NOV SENT OUT Not available § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND THE CEILING AT PUBLIC HALL, 5th STORY
May 10, 2023 A NOV SENT OUT Not available § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND THE CEILING AT PUBLIC HALL, 4th STORY
May 10, 2023 A NOV SENT OUT Not available § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND THE CEILING AT PUBLIC HALL, 3rd STORY
May 10, 2023 B NOV SENT OUT Not available § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRES AT WEST WALL AT PUBLIC HALL, 3rd STORY
May 10, 2023 B NOV SENT OUT Not available § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRES AT WEST WALL AT PUBLIC HALL, 2nd STORY
May 10, 2023 B NOV SENT OUT Not available § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRES AT 2ND STORY BUILDING FRONT , 2nd STORY
May 10, 2023 A NOV SENT OUT Not available § 27-2021 ADM CODE PROVIDE PLACE WITHIN THE BUILDING FOR THE STORAGE OF WASTE RECEPTACLES AND DISINFECT SAME REGULARLY.
May 5, 2023 B NOV SENT OUT 8 § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER FROM BUILDING ENTRANCE TO THE RETURN PANEL AT EAST WALL AT FOYER IN THE ENTRANCE LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
May 5, 2023 B NOV SENT OUT 8 § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
May 5, 2023 B NOV SENT OUT 8 § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AND SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
May 5, 2023 B NOV SENT OUT 8 § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
May 5, 2023 B NOV SENT OUT 8 § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
May 5, 2023 B NOV SENT OUT 8 § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
May 3, 2023 B NOV SENT OUT Not available § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE THE OBSTRUCTION IN FIREPROOF PASSAGEWAY LOCKED GATE AT REAR YARD. YARD
May 3, 2023 C VIOLATION DISMISSED Not available § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING LOCKABLE SLIDEBOLT INSTALLED AT BULKHEAD DOOR. , 5th STORY
May 3, 2023 C VIOLATION CLOSED Not available § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT BULKHEAD. , 5th STORY
May 3, 2023 B NOV SENT OUT 8 § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS. IN THE BATHROOM LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
May 3, 2023 B NOV SENT OUT 8 § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK. IN THE KITCHEN LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
May 3, 2023 B NOV SENT OUT 8 § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
May 3, 2023 B NOV SENT OUT 8 § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE METAL CEILING. IN THE KITCHEN LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
May 3, 2023 B NOV SENT OUT 8 § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS. IN THE 4th ROOM FROM EAST LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
May 3, 2023 C NOV SENT OUT 8 § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING. IN THE 3rd ROOM FROM EAST LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
May 3, 2023 B NOV SENT OUT 8 § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS. IN THE 3rd ROOM FROM EAST LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
May 3, 2023 C NOV SENT OUT 8 § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
May 3, 2023 C NOV SENT OUT 8 § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING. IN THE 2nd ROOM FROM EAST LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
May 3, 2023 B NOV SENT OUT 8 § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS. IN THE 1st ROOM FROM EAST LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
May 3, 2023 C NOV SENT OUT 8 § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING. IN THE 1st ROOM FROM EAST LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Feb 17, 2023 B NOV SENT OUT 8 § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE 4th ROOM FROM EAST LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
Feb 17, 2023 B NOV SENT OUT 8 § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
Feb 17, 2023 B NOV SENT OUT 8 § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE METAL CEILING IN THE KITCHEN LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
Feb 17, 2023 B NOV SENT OUT 8 § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE 3rd ROOM FROM EAST LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
Feb 17, 2023 B NOV SENT OUT 8 § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE 5th ROOM FROM EAST LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
Feb 17, 2023 C NOT COMPLIED WITH 8 § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
Jan 23, 2023 B NOV SENT OUT 8 § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 5th ROOM FROM EAST LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Jan 23, 2023 B NOV SENT OUT 8 § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Jan 23, 2023 B NOV SENT OUT 8 § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Jan 23, 2023 B NOV CERTIFIED LATE 8 § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Jan 23, 2023 B NOV SENT OUT 8 § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Jan 9, 2023 B NOV SENT OUT 8 § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Jan 9, 2023 B NOV SENT OUT 8 § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Jan 9, 2023 B NOV SENT OUT 8 § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Jan 9, 2023 B NOV SENT OUT 8 § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Jan 9, 2023 B NOV SENT OUT 8 § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Jan 9, 2023 B NOV SENT OUT 8 § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT 8, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST