Manhattan Hamilton Heights-Sugar Hill
726 St Nicholas Avenue, Manhattan
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
25 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 5, 2026 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: SEAL ALL DOORS AT EXPOSURE 1 TO PREVENT ACCESS TO UNAUTHORIZED PERSON |
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Aug 18, 2023 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMOVE EXISITIN NON-PERMITTED SIDEWALK SHED AT EXP 1 OF 728, 726, &724 ST NICHOLAS AVE AND TIGHTBOARD FENCE SUROUNDING FRONT YARD OF 726 EXPI RED FENCE #MOO721205-I1. AFTER REMOVAL OF UNPERMITED SHED, NEW SHED TO BE PROVIDED EXTENDING FROM SOUTH PROPERTY LINE OF 724 TO 5-0 PAST NOR TH LINE OF 724. ALL DEBRIS TO BE REMOVED FROM FRONT YARD OF 726 ST NIC |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 12, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM-STEEP SCOPED ROOF AT FRONT HAS DETERIORATED WOOD FRAMEACTIVE LEAN AT REAR OF ROOF.PORTION OF PARAPET AT EXP4 REMOVED W/OUT PERMIT AND MISSING WATERPROOFING.COMPLY WITH DOB VIOLATION #022323FEU10903BS |
| Feb 28, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMMISSIONER'S ORDER-DOB VIOLATION #022422FEU10901BS(CONTROL #357382)ISSUED ON 02/24/2022 REQ'D SUBMISSION OF NAMES & REGISTRATION #'S FOR ONSITE PE & DOB REG'D CONTRACTOR(TO PERFORM EMERGENCY WORK)BY 02/24/2022, MEANS & METHOD FOR REMOVALS. REMEDY:COMPLY W/DOB VIOLATION #022422FEU10901BS IMMED |
| Feb 28, 2022 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | PARTIAL DEMOLITION OF THE WHOLE EXPOSURE 1 FRONT FACADE TO GRADE LEVEL AND WEATHERPROOF BACKUP WALL |
| Feb 24, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EWO-FRONT FACADE(EXP1)PARTLY COLLPSD @3&4FL ON 2/23/22.LOOSE&OUTWARD DISPLCD STONE RMAINS @EXP4(SOUTH)END EXP1 WALL ADJ TO PARTIALCOLLAPSE AREA.TOP OF EXP1 FACADE IN IMMINENT DANGER OF FURTHER COLLPSE IMMED RMOVE/DISMNTLE UNSTABLE PORTION FRNT FACAD BYHAND FRM MANLIFT ALL WRK SUPRV&DIRCTD BY PE.SUBMT MEANS&METHODS |
| Feb 23, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM-FRONT FACADE PARTIALLY COLLAPSED ON 02/23/2022 AND AGAIN ON 02/27/2022. MISSING STONE FACADE AND PORTIONS OF BRICK BACKUP AT 3 & 4 FLOOR LEVELS MISSING AT EXP1(FRONT). REMEDY: NYSPE STRUCTURAL ENG'R TO IMMED EVAL ENTIRE FRONT FACADE AND DESIGN REPAIRS. FILE FOR REPAIRS BY 03/28/2022. OBTAIN PERMITS AND START WORK BY 04/11/2022 |
| Feb 23, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM-STEEP SCOPED ROOF AT FRONT HAS DETERIORATED WOOD FRAMING. ACTIVE LEAN AT REAR OF ROOF. PORTION OF PARAPET AT EXP4(SOUTH)REMOVED W/O PERMIT & MISSING WATERPROOFING. DETERIORATED & WATER DAMAGE FRAMING OBSERVED AT FRONT OF 4FL W/NEW WOOD FRAMING W/O PERMIT. REMEDY: NYSPE STRUCT ENG'R/NYSRA ARCHITECT TO IMMED EVAL ENTIRE BLDG & DESIGN REPAIR |
| Feb 23, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK-FRONT FACADE PARTIALLY COLLAPSED AT 3RD AND 4TH FLR LEVELS ON 2/23/22. LOOSE/OUTWARD DISPLACED STONE AT EXP4(SOUTH)END OF EXP1(FRONT)WALL ADJACENT TO PARTIAL COLLAPSE. CORRODED TIES, DETERIORATED BRICK MORTAR AND LOOSE BRACES ALSO OBSERVED. REMEDY:IMMED INSTALL SIDEWALK SHED AT SIDWALK . FILE FOR PERMIT |
| Feb 23, 2022 | V-DOB VIOLATION - ACTIVE | CLOS-PADLOCK NONE | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER - FRONT DECORATIVE STONE FA ADE IS IN A STATE OF DISREPAIR WITH A SECTION APPROX. 15FT X 10FT HAD FALLEN WITH THE REMAINING IN DANGER OF COLLAPSING |
| Jan 17, 2020 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT |
| Mar 3, 2015 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT |
| May 4, 1998 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Sep 16, 1997 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 10, 1997 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 29, 1995 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 18, 1994 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 18, 1993 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |