Manhattan Hell's Kitchen
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
7 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Dec 14, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. TEMPORARY WOOD STRUCTURE ERECTED APPROXIMATELY 16' IN LENGTH X 8' IN WIDTH X 8' IN HEIGHT AND MECHANICALLY FASTENED BACK TO ALUMINUM STOREFRONT AT EXPOSURE #1. STRUCTURE ENCROACHES ONTO PUBLIC SIDEWALK APPROX 8'. STRUCTURE LOCATED IN FRONT OF BUSINESS "HK FUSION". |
| Dec 14, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | COMMISSIONERS ORDER FOR CORRECTIVE ACTIONS. NOTED ; FOLLOWING CONDITIONS TO BE RESTORED IMMEDIATELY- RESTORE PUBLIC RIGHT OF WAY. RETURN SIDEWALK AT EXPOSURE #1 (10TH AVE) TO PREVIOUS LEGAL CONDITION - REMOVE OBSTRUCTION (WOOD STRUCTURE). |
| Oct 1, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT |
| Mar 3, 2015 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT |
| Dec 3, 2014 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 13, 2014 | V-DOB VIOLATION - ACTIVE | P-PLUMBING NONE | PLUMBING WORK IN BATHROOM OF INDIAN RESTAURANT WITHOUT A PERMIT. NEW PLUMBING PIPING & FIXTURES INSTALLED FOR BATHROOM 1ST FLOOR REMEDY: OBTAIN A PERMIT |
| May 15, 2014 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |