Manhattan Murray Hill-Kips Bay
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 14, 2022 | V*-DOB VIOLATION - DISMISSED | COMPBLD-STRUCTURALLY COMPROMISED BUILDING NONE | FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG. |
| Sep 8, 2014 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FM. BULGING IS A 4 STROY BRICK AND MOTAR TIMBER FRAMED DUPLEX WITH GROUND FLOOR RETAIL SPACE.DAMAGED OBSERVED ON SECOND FLOOR(CRACKING & WATER DAMAGE) CRACKING OBSEERVED IN EXTERIOR BRICK WALL.REMEDY:OWNER TO HIRE LIC NYS PE TO PERFOMR FULL STRUCTUAL EVAL AND SEND REPORT TO ERIC HOYT. REPAIRS TO BEE FILED AND WORK STARTED NY 11/3/14 |
| Aug 1, 2014 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DUE TO FIRE |