Manhattan East Village
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
15 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 8, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED AT 3RD FLOOR, 2ND WINDOW FROM EXPOSURE 2 HAS HORIZONTAL CRACK IN STONE HEADER ABOVE WINDOW. |
| Nov 14, 2025 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 29, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK.DAMAGED BY EVACUATION AT ADJACENT LOT.EAST&SOUTH WALL GAVE SETTLED &MULTIPLE CRACK WE FOUND THROUGHOUT.IMMEDIATELY COMPLY WITH COMMISSIONER ORDER #343147 |
| Apr 29, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM.NUMEROUS SIGNIFICANT CRACKS OBSERVED @SOUTHEAST&EAST WALLS CRACK IN FINISHES OBSERVED@THE INTERIOR@ALL FLOORS.FLOOR FRAMING@5TH FLOOR DISPLACED.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 343146 |
| Feb 12, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | PROPERTY IS UNDER FULL VACATE ORDER ISSUED 11/28/2023 DUE TO BUILDING BEING STRUCTURALLY COMPROMISED WITH SEAL COMPLETED UNDER EMERGENCY DECLARATION. FRONT PLYWOOD DOOR HAS BEEN FORCIBLY OPENED AND IS NOW NOT ABLE TO BE LOCKED. |
| Feb 12, 2024 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY : SEAL ALL 1ST FLOOR ENTRANCES TO PROPERTY EXP #1 AND #3 |
| Feb 7, 2024 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 1, 2023 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: INSTALL TEMPORARY SHORING FROM CELLAR TO ROOF AS FOLLOWS: A) ADJACENT TO EXP 2 WALL DEPTH OF THE BUILDING. B) ADJACENT TO EXP 4 WAL L FROM PUBLIC HALLWAY TO THE EXP 3. INSTALL JOIST TIES AT EXP 2 WALL TO BRACE WALL AT ALL FLOOR LEVELS |
| Nov 30, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK.DAMAGED BY EVACUATION AT ADJACENT LOT.EAST &SOUTH WALL HAVE SETTLED & MULTIPLE CRACK WE FOUND THROUGHOUT.IMMED STABILIZE BLDG FOUNDATIONS TO ARREST FRTHR MVMNT ALL WRK TO BE PRFRMD UNDR DRCT & CNTINUOUS SPRVSN OF PE&DOB REG |
| Nov 30, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM.NUMEROUS SIGNIFICANT CRACKS OBSERVED @SOUTH&EAST WALLS CRACK IN FINISHES OBSERVED@THE INTERIOR @ ALL FLOORS.FLOOR FRAMING @5TH FLOOR DISPLACED.OWNER TO ENGAGE NYS PE&CNTRCTR TO EVAL&REPAIR BLDG UNDER PRMT.FILE FOR PRMT BY STRT WRK BY 12/29/23,CMPLT BY 6/15/24 |
| Nov 29, 2023 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY : PROVICE APPOXIMATELEY 27 LINEAR FEET OF CONSTRICTION FENCE AT EXPSURE 3 TO TH ELOT LINE WITH A RETURN OF APPOXIMATELY 10 LINEAR FEE T AT EXPOSUER 2 AND 4 TO ENCLOSE POTENTIAL COLLAPSE ZONE |
| Nov 29, 2023 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: PROVIDE APPROXIMATELY 35 LINEAR FEET OF SIDEWALK SHE AT EXPOSU RE 1 TO SAFEQUARD THE PUBLIC AND PROPERTY |
| Nov 28, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT DUE TO CRACKS OBSERVED ON FACADE IN MULTIPLE LOCATIONS IN ADDITION TO CRACKS ON THE INTERIROR WITH SEPARAT ION NOTED FROM DOOR FRAME TO WALL AND FLOOR TO WALL DUE TO CONSTRUCTIO N OPERATIONS AT 644 EAST 14TH STREET |
| Mar 18, 1993 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| May 9, 1990 | V-DOB VIOLATION - ACTIVE | ES-ELECTRIC SIGNS NONE | ES-ELECTRIC SIGNS NONE |