Manhattan Murray Hill-Kips Bay
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
11 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 7, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Aug 20, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Aug 18, 2021 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | TIE BACK FLOOR JOISTS AT THE 1,2,3, 4 & ROOF LEVELS TO THE EXPOSURE 2 WALL. WALL/JOIST TIES TO BE DESIGNED BY A NYS PE |
| Aug 16, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMMISH ORDER #356950(040621FEU10601PN)DATED 04/06/21,REQ OWNR TO PERMANENTLY REPR THE BLDG UNDER PERMT STARTING BY 06/01/21.A PERMT FOR WORK WAS ISSUED 06/11/21,FOR JOB M00526306-I1,BUT AS OF 8/16/21 NO PERMANENT REPR WRK HAS STARTED.IMMED COMPLY W/COMMISH ORDER #356950(040621FEU10601PN)DATED 04/06/21 TO PERMANTLY REPR BLDG |
| Aug 16, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERG WORK ORDER:EXP1 MASN FACADE HAS VARIOUS STEP CRACKS EMANATING FRM WINDW LINTLS.BRICKS BULG OUT.LINTLS INADQ SUPPRT'D @CRACKD/SHIFTED LOCAT'S.EXP3 SIM CONDNS.CONDNS POSE A DANGR TO PUBLC.OWNER RETAN NYSPE CONTRCTR TO IMMD TMP BRACE/STABLZE EXP1&3 MASN FAÇADE & LINTLS.PE SEND MEANS+MTHDS RVW+APPRVL.PE PROV SUPV.STRT WRK BY 8/19/21.FILE W/I 2DAYS |
| Jul 21, 2021 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 9, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Apr 6, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERG WRK:DUE TO ADJ EXCAV/CONST @609 2AVE,BLDG @617 STRCTLY-UNSTABLE, RACK,LEAN TWRD ADJ EXCAV SITE@609 2AVE.INTR&EXTR CRCKS.EXP2 WALL INADQ BRCD.1FL SLPD EXP2 W/1ST&2FL JOIST DETER INADQ SUPRT@EXP2.ROOF SEP@EXP 1/4CRNR BTWN 617/619.OWNR IMMD RETN PE&CONTR INSTL FL SHOR@FULL LGTH & HGHT EXP2.PE PROV SUPV WRK.SUBM RPTS W/PHOTS.FIL W/I 2DA.STRTBY 4/7/21 |
| Apr 6, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FULL VACATE/FTM:DUE TO ADJ EXCAV CONST AT 609 2AVE,BLDG AT 617 STRCTLY RENDERED UNSTBLE.CRKS@EXP1,2,3 THR-OUT.EXP2 WALL INADQ BRCED.1ST FLOOR JOIST ROT'D/PRTLY DETCH EXP2.CRCKD&LEAN TWRD ADJ EXCAV@609.BLDG UNSAFE OCUPY.FULLY VACATE BLDG TIL HAZ COND REMED.OWNR ENGAG NYSPE EVAL ENTRE BLDG&PREP RPR DWGS.BLDG RPR UNDR PRMT STRT BY 6/1/21 &CMPLT BY 7/16/21 |
| Apr 5, 2021 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL SIDEWALK SHED 20 LINEAR LONG AT THE FRONT FAÇADE (EXPOSURE 1) TO SAFEGUARD THE PUBLIC AND PROPERTY |
| Jan 19, 2007 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |