NYC Building Report

Manhattan Murray Hill-Kips Bay

617 2 Avenue, Manhattan

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

11 records

Date Status Type Summary
Apr 7, 2022 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Aug 20, 2021 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Aug 18, 2021 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL TIE BACK FLOOR JOISTS AT THE 1,2,3, 4 & ROOF LEVELS TO THE EXPOSURE 2 WALL. WALL/JOIST TIES TO BE DESIGNED BY A NYS PE
Aug 16, 2021 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO COMPLY WITH COMMISH ORDER #356950(040621FEU10601PN)DATED 04/06/21,REQ OWNR TO PERMANENTLY REPR THE BLDG UNDER PERMT STARTING BY 06/01/21.A PERMT FOR WORK WAS ISSUED 06/11/21,FOR JOB M00526306-I1,BUT AS OF 8/16/21 NO PERMANENT REPR WRK HAS STARTED.IMMED COMPLY W/COMMISH ORDER #356950(040621FEU10601PN)DATED 04/06/21 TO PERMANTLY REPR BLDG
Aug 16, 2021 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERG WORK ORDER:EXP1 MASN FACADE HAS VARIOUS STEP CRACKS EMANATING FRM WINDW LINTLS.BRICKS BULG OUT.LINTLS INADQ SUPPRT'D @CRACKD/SHIFTED LOCAT'S.EXP3 SIM CONDNS.CONDNS POSE A DANGR TO PUBLC.OWNER RETAN NYSPE CONTRCTR TO IMMD TMP BRACE/STABLZE EXP1&3 MASN FAÇADE & LINTLS.PE SEND MEANS+MTHDS RVW+APPRVL.PE PROV SUPV.STRT WRK BY 8/19/21.FILE W/I 2DAYS
Jul 21, 2021 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jun 9, 2021 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Apr 6, 2021 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERG WRK:DUE TO ADJ EXCAV/CONST @609 2AVE,BLDG @617 STRCTLY-UNSTABLE, RACK,LEAN TWRD ADJ EXCAV SITE@609 2AVE.INTR&EXTR CRCKS.EXP2 WALL INADQ BRCD.1FL SLPD EXP2 W/1ST&2FL JOIST DETER INADQ SUPRT@EXP2.ROOF SEP@EXP 1/4CRNR BTWN 617/619.OWNR IMMD RETN PE&CONTR INSTL FL SHOR@FULL LGTH & HGHT EXP2.PE PROV SUPV WRK.SUBM RPTS W/PHOTS.FIL W/I 2DA.STRTBY 4/7/21
Apr 6, 2021 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FULL VACATE/FTM:DUE TO ADJ EXCAV CONST AT 609 2AVE,BLDG AT 617 STRCTLY RENDERED UNSTBLE.CRKS@EXP1,2,3 THR-OUT.EXP2 WALL INADQ BRCED.1ST FLOOR JOIST ROT'D/PRTLY DETCH EXP2.CRCKD&LEAN TWRD ADJ EXCAV@609.BLDG UNSAFE OCUPY.FULLY VACATE BLDG TIL HAZ COND REMED.OWNR ENGAG NYSPE EVAL ENTRE BLDG&PREP RPR DWGS.BLDG RPR UNDR PRMT STRT BY 6/1/21 &CMPLT BY 7/16/21
Apr 5, 2021 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL INSTALL SIDEWALK SHED 20 LINEAR LONG AT THE FRONT FAÇADE (EXPOSURE 1) TO SAFEGUARD THE PUBLIC AND PROPERTY
Jan 19, 2007 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED