Manhattan East Harlem (South)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 24, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EWO DUE TO PARAPET IS LEANING OUTWARD TOWARD PUBLIC RIGHT-OF-WAY ALONG ITS ENTIRE LENGTH. CORNICE IS TILTING DOWNWARD. ALSO LOOSE MATERIAL AT ALL EXPOSURES. REMEDY: IMMEDIATELY PROVICE SAFETY MEASURES AT ALL EXPOSURES TO SECURE/PROTECT THE PUBLIC AND REMOVE ALL LOOSE MATERIALS |
| May 15, 2014 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| Nov 30, 2007 | V*-DOB VIOLATION - DISMISSED | LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL |
| Aug 29, 1995 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |