Manhattan Washington Heights (North)
550 West 184 Street, Manhattan
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 3, 2025 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: PROVIDE APPROXIMATELY 50 LINEAR FEET OF SIDEWALK SHED AT AUDUBON AVENUE (EXPOSURE #1) TO SAFEGUARD THE PUBLIC AND PROPERTY |
| Nov 1, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED CORNICE ATEXPOSURE#2 IN DISREPAIR WITH OPENINGS AND ELEMENTS FALLING ONTO PUBLIC SIDEWALK. THERE IS POTENTIAL OF DEBRIS FURTHER COLLAPSING ONTO FIRE ESCAPE COMPROMISING SECOND MEANS OF EGRESS. |
| Nov 1, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | REQUESTING AN ENGINEER REPORT DUE TO A SECTION OF CORNICE IN DISREPAIR AT EXPOSURE#2 OF BUILDING WITH POTENTIAL OF FURTHER COLLAPSING. AN ENGINEERING REPORT IS REQUIRED TO ASSESS AND RECTIFY THE DAMAGES PROPERTY HAS SUSTAINED. |
| Mar 4, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | THE BOROUGH COMMISSIONER HAS ISSUED A SWO FOR APP #123337512 DUE TO THE REVOCATION AND APPROVAL OF PERMIT. UNABLE TO DETERMINE PERCENTAGE OF WORK COMPLETED DUE TO GROUND FLOOR RESTAURANT BEING CLOSED. PARTIAL STOP WORK ORDER ISSUED FOR GROUND LEVEL COMMERCIAL SPACE. |
| Jan 3, 2008 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Apr 6, 1993 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |