Manhattan Washington Heights (South)
541 West 159 Street, Manhattan
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
7 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 2, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AT TIME OF INSPECTION OBSERVED TEMPORARY CONSTRUCTION FENCE INSTALL AT FRONT OF PROPERTY WITH NO ACTIVE PERMIT ON 10/2/2026 AT 10:40 AM. |
| Jul 8, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | UNBRACED WALLS FOUND DUE TO FLOOR JOIST REMOVAL W/O REPLACEMENT STRUCTURAL FILING.UNSAFE CONIDTION POSES HAZARD TO PUBLIC/PROPERTY RETAIN NYS RDP TO BRACE/SHORE W FULL-TIME SUPERVISION.SUBMIT BY 7/8, STRT BY 7/9/25.SEND DAILY UPDATES TO CSE |
| Jul 2, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | UNBRACED WALLS FOUND DUE TO FLOOR JOIST REMOVAL W/O REPLACEMENT. NO STRUCTURAL FILING. UNSAFE CONDITION POSES HAZARD TO PUBLIC & PROPERTY REMEDY: RETAIN NYS RDP FOR MONITORING PLAN W/ THRESHOLDS & REPORTING SUBMIT PLAN & BASELINE DATA BY 7/03/25 TO CSE |
| Jul 2, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | UNBRACED WALLS FOUND DUE TO FLOOR JOIST REMOVAL W/O REPLACEMENT. NO STRUCTURAL FILING. UNSAFE CONDITION POSES HAZARD TO PUBLIC & PROPERTY REMEDY: RETAIN NYS RDP FOR DAILY SS INSPECTIONS PER AC28-116.2.2 |
| Jul 1, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | UNPERMITTED/UNDOCUMENTED STRUCTURAL ALTERATIONS AND DEMO OF INTERIOR FRAMING WITH REMOVAL OF HORIZONTAL FLOOR JOISTS AT 2ND & 3RD FLOOR. STRUCTURAL WORK PERFORMED WITH NO APPROVED PLANS OR SEQUENCE OF DEMO OPERATIONS. |
| May 18, 2019 | V%-DOB VIOLATION | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| Jun 20, 2008 | V-DOB VIOLATION - ACTIVE | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |