Manhattan East Village
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
16 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 26, 2019 | V*-DOB VIOLATION - DISMISSED | EGNCY-EMERGENCY NONE | PROVIDE APPROX. 35 LINEAR FEET OF SIDEWALK SHED ALONG EXP#1, & APPROX 30' X 30' OF OVERHEAD PROTECTION/SIDEWALK SHED ALONG EXP#2(COURT YARD) |
| Nov 1, 2019 | V*-DOB VIOLATION - DISMISSED | EGNCY-EMERGENCY NONE | PROVIDE APPROX. 35 LINEAR FT OF SIDEWALK SHED ALONG EXP#1 |
| Oct 31, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING WALLS OR APPURTENANCES. NOTED ON EXPOSURE #1 ABOVE 5TH FLOOR WINDOWS STONE DELAMINATING AND IN DANGER OF FALLING TO STREET. EXPOSURE #2 IS IN COMPLETE DISREPAIR WITH STEP CRACKS DISLODGED BRICK AND BULGING BRICK. BRICK CHIMNEY ON ROOF CRACKED AND BULGING |
| Oct 1, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT |
| Mar 3, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT |
| Apr 18, 2012 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 25, 2012 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 13, 2011 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT |
| Jan 13, 2011 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 17, 2010 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN: STRUCTURAL STRESS CRACKS AT NUMEROUS LOCATIONS ON ALL FLOORS OF EAST ELEVATION (EXPOSURE #2) W/BUILDING SHIFTING-WESTWA RD & BULGE IN BRICK CHIMNEY AT 4TH FLOOR |
| Dec 31, 2009 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED |
| Jan 3, 2008 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 26, 2002 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| May 4, 1998 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 18, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 18, 1993 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |