Manhattan Upper West Side (Central)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
1 record
| Date | Status | Type | Summary |
|---|---|---|---|
| Feb 18, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER. AT TIME OF INSPECTION AT THE INTERIOR PARTY WALL EXPOSURE #2. FROM BASEMENT-4TH FL. VERTICAL CRACKS (THIN) FROM FLOOR TO CEILING. PROVIDE MONITORING OF CRACKS. REMEDY: REPAIR AND REPLACE. SUBMIT ENGINEERS REPORT TO VERFIY THE STABILITY OF PARTY WALL AT EXPOSURE #2 |