Manhattan Chinatown-Two Bridges
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
8 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 20, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Nov 4, 2020 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM:ROOF PARAPT LEAN/BULG@EXP2,CRCKED/PRTLY DETCH@EXP2/3 CRNR,&LEAN IN @EXP3.CHIM@EXP1/4 CRNR CRCKED&LEAN OUT TWRD ADJ CONST SITE@EXP4.COPING STONE LEAN/DETER.BULKHED CRCK@EXP3/4 CRNR@STUCCO SPALLNG@ALL EXPOSURES OWNR TO RETN NYSPE TO EVAL ENTRE BLDG&PREP REPR PLNS.BLDG TO BE REPR'D UNDER PERMIT START BY 12/21/20 AND COMPLETED AND SIGNED OFF BY 2/12/21 |
| Nov 4, 2020 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERG WORK:ROOF PARAPET DISRPR W/EXP2 LEAN IN&BULG OUT@ROOF LVL,EXP2/3 PARPET CRCK/PRTLY DETCH&LEAN.COPE STONE LOSE.CHIM@EXP2 CRCK LEAN TWRDS ADJ CONST SITE.ROOF BULKHED CRCK@EXP3/4.BLD PRSNT HAZ OVRHED COND.PROV OVERHED PROT@EXP2/3.OWNR RETN PE EVAL ENTRE BLD&LIC'D CONTR PRTLY REMV BRACE HAZ CONDNS.INSTL TMP WETHERPROOF.STRT 11/12/2.FILE 2D.SUPV/DIRCT |
| Mar 16, 1999 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| May 4, 1998 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 29, 1995 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Sep 1, 1994 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |