Manhattan Hamilton Heights-Sugar Hill
45 Hamilton Terrace, Manhattan
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 1-02050-0109), so they can include other buildings on the same lot.
427 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Mar 21, 2026 | C | FIRST NO ACCESS TO RE- INSPECT VIOLATION | 10 | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 10, 4th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 21, 2026 | C | VIOLATION CLOSED | 10 | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 10, 4th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 17, 2026 | C | VIOLATION CLOSED | 10 | § 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRICAL HEATING IN GOOD OPERATING CONDITION FOR THE DWELLING UNIT IN THE ENTIRE APARTMENT LOCATED AT APT 10, 4th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 17, 2026 | C | VIOLATION CLOSED | 10 | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 10, 4th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 11, 2026 | C | VIOLATION CLOSED | 10 | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 10, 4th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 6, 2026 | C | VIOLATION CLOSED | 10 | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE 3rd ROOM FROM NORTH LOCATED AT B-ROOM 10, 4th STORY, 1st B-ROOM FROM WEST AT NORTH |
| Mar 6, 2026 | C | VIOLATION CLOSED | 10 | § 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRICAL HEATING IN GOOD OPERATING CONDITION FOR THE DWELLING UNIT IN THE 3rd ROOM FROM NORTH LOCATED AT B-ROOM 10, 4th STORY, 1st B-ROOM FROM WEST AT NORTH |
| Mar 3, 2026 | C | VIOLATION CLOSED | 10 | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 10, 4th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Feb 20, 2026 | C | NOV SENT OUT | Not available | § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT THE WATER MAIN VALVE AT BASEMENT |
| Feb 20, 2026 | C | NOV SENT OUT | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ENTRANCE DOOR AT BOILER ROOM |
| Feb 20, 2026 | C | VIOLATION CLOSED | 10 | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 10, 4th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Feb 20, 2026 | C | VIOLATION DISMISSED | 10 | § 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRICAL HEATING IN GOOD OPERATING CONDITION FOR THE DWELLING UNIT IN THE ENTIRE APARTMENT LOCATED AT APT 10, 4th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Feb 19, 2026 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | 10 | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 10, 4th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Feb 19, 2026 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | 10 | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 10, 4th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Feb 19, 2026 | A | NOV SENT OUT | Not available | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT BOILER ROOM |
| Feb 19, 2026 | C | NOV SENT OUT | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PLASTER WITH FIRE RATED MATERIAL AT THE CEILING AT BOILER ROOM |
| Feb 19, 2026 | C | VIOLATION CLOSED | Not available | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING AT BOILER ROOM |
| Feb 19, 2026 | A | NOV SENT OUT | Not available | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT BASEMENT |
| Feb 19, 2026 | C | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PLASTER WITH FIRE RATED MATERIAL AT THE CEILING AT BASEMENT |
| Feb 19, 2026 | C | VIOLATION CLOSED | 10 | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES .. IN THE ENTIRE APARTMENT LOCATED AT APT 10, 4th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Feb 19, 2026 | C | VIOLATION DISMISSED | 10 | § 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRICAL HEATING IN GOOD OPERATING CONDITION FOR THE DWELLING UNIT IN THE ENTIRE APARTMENT LOCATED AT APT 10, 4th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Feb 18, 2026 | C | NOV SENT OUT | Not available | § 27-2005, 2050 HMC: PROVIDE AN ADEQUATE SUPPLY OF WATER FOR THE WET SPRINKLER AND/OR STANDPIPE SYSTEM AT ALL STOIRES AT PUBLIC HALL |
| Feb 18, 2026 | C | VIOLATION CLOSED | Not available | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES NO WATER SUPPLY AT COMMUNITY BATHROOM, 4th STORY |
| Feb 18, 2026 | C | VIOLATION CLOSED | Not available | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES NO WATER SUPPLY AT COMMUNITY BATHROOM, 4th STORY |
| Feb 18, 2026 | C | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CONCRETE RAILS AT BUILDING FRONT YARD, 1st STORY |
| Feb 18, 2026 | C | NOV SENT OUT | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RATED MATERIAL AT CEILING AT BOILER ROOM |
| Feb 18, 2026 | C | VIOLATION CLOSED | Not available | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT BOILER ROOM |
| Feb 18, 2026 | B | NOV SENT OUT | Not available | § 27-2050 ADM CODE SEAL IN OPEN POSITION THE O.S.Y. VALVE OF THE SPRINKLER SYSTEM IN ACCORDANCE WITH THE RULES AND REGULATIONS OF THIS DEPARTMENT NOT SEALED IN OPEN POSITION AT CELLAR |
| Feb 18, 2026 | C | NOV SENT OUT | Not available | § 27-2010, 2011, 2012 ADM CODE CLEANSE AND DISINFECT TO THE SATISFACTION OF THIS DEPARTMENT AFTER REMOVING THE STAGNANT WATER AT CELLAR |
| Feb 18, 2026 | C | NOV SENT OUT | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RATED MATERIAL AT CEILING AT CELLAR |
| Feb 18, 2026 | C | FIRST NO ACCESS TO RE- INSPECT VIOLATION | 10 | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE ROOM LOCATED AT B-ROOM 10, 4th STORY, 1st B-ROOM FROM NORTH AT EAST |
| Feb 18, 2026 | C | VIOLATION CLOSED | 10 | § 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRICAL HEATING IN GOOD OPERATING CONDITION FOR THE DWELLING UNIT IN THE 3rd ROOM FROM EAST LOCATED AT B-ROOM 10, 4th STORY, 1st B-ROOM FROM NORTH AT EAST |
| Feb 18, 2026 | C | VIOLATION CLOSED | 10 | § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 10, 4th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Feb 18, 2026 | C | VIOLATION CLOSED | 10 | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES NO WATER SUPPLY IN THE KITCHEN IN THE KITCHENETTE LOCATED AT B-ROOM 10, 4th STORY, 1st B-ROOM FROM NORTH AT EAST |
| Feb 18, 2026 | C | VIOLATION CLOSED | 10 | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES NO WATER SUPPLY IN THE KITCHEN IN THE KITCHENETTE LOCATED AT B-ROOM 10, 4th STORY, 1st B-ROOM FROM NORTH AT EAST |
| Feb 5, 2026 | B | NOV SENT OUT | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR BELL AT BUILDING ENTRANCE AT PUBLIC HALL, 1st STORY |
| Nov 17, 2025 | I | VIOLATION DISMISSED | Not available | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED. |
| Sep 15, 2025 | B | NOV SENT OUT | Not available | § 27-2005 HMC: REFIT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY |
| Sep 15, 2025 | C | VIOLATION CLOSED | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK AT VESTIBULE DOOR AT PUBLIC HALL, 1st STORY |
| Sep 4, 2025 | B | VIOLATION DISMISSED | 10 | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 10, 4th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Sep 4, 2025 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | 10 | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AROUND RADIATOR IN THE BATHROOM LOCATED AT APT 10, 4th STORY, APARTMENT AT EAST |
| Sep 4, 2025 | C | FIRST NO ACCESS TO RE- INSPECT VIOLATION | 10 | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 10, 4th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Sep 4, 2025 | C | FIRST NO ACCESS TO RE- INSPECT VIOLATION | 10 | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WINDOW BALANCE LOWER SASH AT EAST WALL IN THE BATHROOM LOCATED AT APT 10, 4th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Sep 4, 2025 | C | VIOLATION CLOSED | 10 | § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE BATHTUB IN THE BATHROOM LOCATED AT APT 10, 4th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Sep 4, 2025 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | 10 | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE RUBBER GASKET AT REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 10, 4th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Jun 4, 2025 | A | NOV SENT OUT | Not available | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. |
| Apr 17, 2025 | C | VIOLATION CLOSED | Not available | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT BATHROOM AT COMMUNITY BATHROOM, 4th STORY |
| Apr 17, 2025 | C | VIOLATION CLOSED | Not available | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT BATHROOM AT COMMUNITY BATHROOM, 4th STORY |
| Apr 17, 2025 | B | NOV SENT OUT | Not available | § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES STOVE CAUSE UNKNOWN AT COMMUNITY KITCHEN, 4th STORY |
| Nov 22, 2024 | I | VIOLATION DISMISSED | Not available | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED. |