Manhattan Chelsea-Hudson Yards
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
12 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 11, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.AT TIME OF INSPCTN,OBSRVD FACADE IN A STATE OF DISREPAIR.AT EXP1,DIAGONAL HEADR TYPE FACADE W/BULGE BTWN 4TH&5TH FLRS TWRDS EXP4 SIDE,W/WNDWS VISIBLY OUT OF ALIGNMNT W/OUTR MSNRY.COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #020725FEU10401AK (CONTROL #341917) IMMEDIATELY |
| Mar 3, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | ADDITIONAL INFORMATION.AT TIME OF INSPECTN,OBSRVD FACADE IN A STATE OF DISREPAIR.AT EXP1,DIAGONL HEADR TYPE OF FACADE W/BULGE BTWN4TH&5TH FLRS TWRDS EXP4 SIDE W/WINDOWS VISIBLY OUT OF ALIGNMENT W/OUTR MA COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #020725CFEU10402AK (CONTROL #341918)IMMEDIATELY |
| Feb 7, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.AT TIME OF INSPECTN,OBSRVD FACADE IN A STATE OF DISREPAIR.AT EXP1,DIAGONAL HEADR TYPE OF FACADE W/BULGE BTWN 4TH&5TH FLRS TWRDS EXP4 SIDE,W/WNDWS VISIBLY OUT OF ALIGNMNT W/OUTR MSNRY.OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO EVAL THE ENT BLDG&RPAIR UNDR PRMT |
| Feb 7, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.AT TIME OF INSPCTN,OBSRVD FACADE IN A STATE OF DISREPAIR.AT EXP1,DIAGONL HEADR TYPE FACAE W/BULGE BTWN 4TH&5TH FLRS TWRDS EXP4 SIDE,W/WNDWS VISIBLY OUT OF ALIGNMNT W/OUTR MASONRY.OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO EVAL THE ENT BLDG&RPAIR UNDR PRMT,W/ PRMTS FILED BY 4/7/25.SGN OFF RPAIR WRK 6/9/25 |
| Jan 6, 2006 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| May 3, 2002 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| May 7, 1997 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| May 7, 1997 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Nov 21, 1995 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Nov 21, 1995 | VP-VIOLATION UNSERVED ECB-ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Aug 29, 1995 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Sep 1, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |