NYC Building Report

Manhattan Stuyvesant Town-Peter Cooper Village

430 East 20 Street, Manhattan

HPD violations

Housing Maintenance Code violations are filed by tax lot (BBL 1-00972-0001), so they can include other buildings on the same lot.

626 records

Date Class Status Apartment Summary
Feb 19, 2021 C VIOLATION CLOSED 11C § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 11C, 12th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Feb 19, 2021 C VIOLATION CLOSED 11F § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 11F, 12th STORY, 1st APARTMENT FROM WEST AT NORTH
Feb 19, 2021 C VIOLATION CLOSED 12B § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 12B, 13th STORY, 1st APARTMENT FROM EAST AT SOUTH
Feb 19, 2021 C VIOLATION CLOSED 12E § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 12E, 13th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Feb 19, 2021 C VIOLATION CLOSED 12H § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 12H, 13th STORY, 1st APARTMENT FROM NORTH AT EAST
Jan 29, 2021 C VIOLATION CLOSED 10E § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 10E, 11th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''274'', 2nd FROM NORTH AT EAST
Jan 29, 2021 C VIOLATION CLOSED 12D § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 12D, 13th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''274'', 2nd FROM NORTH AT EAST
Jan 29, 2021 C VIOLATION CLOSED 12C § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 12C, 13th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''274'', 2nd FROM NORTH AT EAST
Jan 29, 2021 C VIOLATION CLOSED 12A § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 12A, 13th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''274'', 2nd FROM NORTH AT EAST
Jan 29, 2021 C VIOLATION CLOSED 11E § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 11E, 12th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''274'', 2nd FROM NORTH AT EAST
Jan 29, 2021 C VIOLATION CLOSED 9E § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 9E, 10th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''274'', 2nd FROM NORTH AT EAST
Jan 29, 2021 C VIOLATION CLOSED 8E § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 8E, 9th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''274'', 2nd FROM NORTH AT EAST
Jan 29, 2021 C VIOLATION CLOSED 8C § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 8C, 9th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''274'', 2nd FROM NORTH AT EAST
Jan 29, 2021 C VIOLATION CLOSED 6A § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 6A, 7th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''274'', 2nd FROM NORTH AT EAST
Jan 29, 2021 C VIOLATION CLOSED 4F § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''274'', 2nd FROM NORTH AT EAST
Jan 29, 2021 C VIOLATION CLOSED 4D § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''274'', 2nd FROM NORTH AT EAST
Jan 29, 2021 C VIOLATION CLOSED 3B § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''274'', 2nd FROM NORTH AT EAST
Jan 29, 2021 C VIOLATION CLOSED 1D § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 1D, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''274'', 2nd FROM NORTH AT EAST
Jan 29, 2021 C VIOLATION CLOSED 1D § 27-2005, 2007, 204.1 HMC CODE: ARRANGE AND MAKE SELF-CLOSING THE DOORS ... IN THE ENTRANCE LOCATED AT APT 1D, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''274'', 2nd FROM NORTH AT EAST
Jan 14, 2021 C VIOLATION CLOSED Not available § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.
Jan 14, 2021 C VIOLATION CLOSED 9C § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .... IN THE ENTIRE APARTMENT LOCATED AT APT 9C, 10th STORY, 1st APARTMENT FROM SOUTH AT WEST
Jan 14, 2021 C VIOLATION CLOSED 9B § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ..... IN THE ENTIRE APARTMENT LOCATED AT APT 9B, 10th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Jan 14, 2021 C VIOLATION CLOSED 8C § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ..... IN THE ENTIRE APARTMENT LOCATED AT APT 8C, 9th STORY, 1st APARTMENT FROM SOUTH AT WEST
Jan 14, 2021 C VIOLATION CLOSED 8A § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ...... IN THE ENTIRE APARTMENT LOCATED AT APT 8A, 9th STORY, 1st APARTMENT FROM EAST AT SOUTH
Jan 14, 2021 C VIOLATION CLOSED 8G § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ...... IN THE ENTIRE APARTMENT LOCATED AT APT 8G, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
Jan 14, 2021 C VIOLATION CLOSED 7G § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ..... IN THE ENTIRE APARTMENT LOCATED AT APT 7G, 8th STORY, 1st APARTMENT FROM NORTH AT EAST
Jan 14, 2021 C VIOLATION CLOSED 5A § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .... IN THE ENTIRE APARTMENT LOCATED AT APT 5A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
Jan 14, 2021 C VIOLATION CLOSED 5H § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ..... IN THE ENTIRE APARTMENT LOCATED AT APT 5H, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST
Jan 14, 2021 C VIOLATION CLOSED 4A § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ..... IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Jan 14, 2021 C VIOLATION CLOSED 4H § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .... IN THE ENTIRE APARTMENT LOCATED AT APT 4H, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
Jan 14, 2021 C VIOLATION CLOSED 3E § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 3E, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH
Jan 14, 2021 C VIOLATION CLOSED 2E § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .... IN THE ENTIRE APARTMENT LOCATED AT APT 2E, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
Jan 14, 2021 C VIOLATION CLOSED 2D § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ..... IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
Jan 14, 2021 C VIOLATION CLOSED 1C § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .... IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Jan 14, 2021 C VIOLATION CLOSED MB § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .... IN THE ENTIRE APARTMENT LOCATED AT APT MB, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
Jan 14, 2021 C VIOLATION CLOSED MA § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .... IN THE ENTIRE APARTMENT LOCATED AT APT MA, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Jan 12, 2021 C VIOLATION CLOSED Not available § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT 1ST STORY PUBLIC HALL AND OUTSIDE DOOR OF BOILER ROOM
Jan 12, 2021 A VIOLATION DISMISSED Not available § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
Jan 12, 2021 A VIOLATION DISMISSED Not available § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
Jan 12, 2021 A VIOLATION DISMISSED Not available § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
Dec 31, 2020 A VIOLATION DISMISSED MB § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE CERAMIC TILES AT WEST, NORTH AND SOUTH WALLS AROUND BATHTUB, IN THE 1st BATHROOM FROM EAST LOCATED AT APT MB, 1st APARTMENT FROM SOUTH AT WEST
Dec 20, 2020 A VIOLATION CLOSED 9F § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING, SOUTH AND WEST WALLS IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 9F, 9th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''BLDG15''
Dec 20, 2020 C VIOLATION CLOSED 9F § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT SOUTH AND WEST WALLS (38 SQ FT) IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 9F, 9th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''BLDG15''
Dec 1, 2020 B VIOLATION CLOSED 4G § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL GLAZE OF THE BATHTUB IN THE BATHROOM LOCATED AT APT 4G, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Dec 1, 2020 B VIOLATION DISMISSED 4G § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 4G, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Sep 23, 2020 B VIOLATION CLOSED 10E § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT WEST WALL (6 SQ.FT.) AND AT CEILING (4 SQ. FT.) IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 10E, 10th STORY, 2nd APARTMENT FROM NORTH AT EAST
Sep 23, 2020 B VIOLATION DISMISSED 10E § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 10E, 10th STORY, 2nd APARTMENT FROM NORTH AT EAST
Sep 23, 2020 A VIOLATION DISMISSED 10E § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 10E, 10th STORY, 2nd APARTMENT FROM NORTH AT EAST
Sep 2, 2020 A VIOLATION DISMISSED 7E § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE HEAT RISER IN THE BATHROOM LOCATED AT APT 7E, 7th STORY, 1st APARTMENT FROM EAST AT SOUTH
Sep 2, 2020 A VIOLATION DISMISSED 7E § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 7E, 7th STORY, 1st APARTMENT FROM EAST AT SOUTH