Manhattan Chinatown-Two Bridges
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 4, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 4, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 6, 2017 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FM.WOOD FRAME,MASONRY BEARING WALL COMM/RETAIL BLDG W/ONE STORY REAR EXT.3RD FL EAST FACADE ARE MULT LOCATIONS OF DETERIORATED MORTAR JOINT &SOME LOCATIONS OF CRACKED BRICKS.ATTIC LEVEL, WOOD FRAMED DORMER IS DETERIORATED&LEANING NORTHWARDS.REMEDY:OWNER ENGAGE LIC PROF EVAL&PREP DWGS EFFECT REPAIR.DWGS BE FILE W/DOB NO LATER 7/5/17 |
| Jul 1, 1997 | V*-DOB VIOLATION - DISMISSED | LL1080-LOCAL LAW 10/80 - FACADE FACADE OPTIONAL | LL1080-LOCAL LAW 10/80 - FACADE FACADE OPTIONAL |
| May 27, 1992 | VP-VIOLATION UNSERVED ECB-ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Mar 15, 1989 | V-DOB VIOLATION - ACTIVE | ES-ELECTRIC SIGNS NONE | ES-ELECTRIC SIGNS NONE |