DOB violations

Department of Buildings violations attached to this BIN or tax lot.

24 records

Date Status Type Summary
Nov 14, 2025 V*-DOB VIOLATION - DISMISSED HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
Nov 14, 2025 V*-DOB VIOLATION - DISMISSED HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
Feb 20, 2025 VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Sep 23, 2024 V*-DOB VIOLATION - DISMISSED HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
Sep 23, 2024 V*-DOB VIOLATION - DISMISSED HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V*-DOB VIOLATION - DISMISSED HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V*-DOB VIOLATION - DISMISSED HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V*-DOB VIOLATION - DISMISSED HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V*-DOB VIOLATION - DISMISSED HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 V*-DOB VIOLATION - DISMISSED HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 V*-DOB VIOLATION - DISMISSED HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 V*-DOB VIOLATION - DISMISSED HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 V*-DOB VIOLATION - DISMISSED HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
Apr 25, 2023 V*-DOB VIOLATION - DISMISSED HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
Apr 25, 2023 V*-DOB VIOLATION - DISMISSED HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
Mar 16, 2020 V*-DOB VIOLATION - DISMISSED HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
Mar 16, 2020 V*-DOB VIOLATION - DISMISSED HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
Jun 22, 2018 V*-DOB VIOLATION - DISMISSED HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION
Jun 23, 2017 V*-DOB VIOLATION - DISMISSED HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION
Dec 16, 2016 V*-DOB VIOLATION - DISMISSED HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION
Mar 3, 2015 V*-DOB VIOLATION - DISMISSED HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
Jul 31, 2014 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAIL TO COMPLY WITH COMMISSIONER'S ORDER. THIS BUILDING HAS A WOOD BOWSTRING TRUSS ROOF. THE DOB SERVED YOU A CURABLE COMMISSIONER'S ORDER (NOTICE OF VIOLATION) TO PRODUCE AN ENGINEER'S REPORT ON YOUR BUILDING. NO ENGINEER'S REPORT HAS BEEN RECEIVED. COMPLY WITH THE COMMISSIONER'S ORDER
May 15, 2014 V*-DOB VIOLATION - DISMISSED HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE 2012 ANNUAL HIGH PRESSURE BOILER INSPECTION
May 1, 2014 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL 4037 BROADWAY:1 STORY,OCCUPIED SUPERMARKET/WOOD BOWSTRING TRUSS ROOF WITHIN 60 DAYS OF VIO OWNER TO ENGAGE NYS LIC PE EXPERIENCED W/WOOD TRUSSES,PROBE&EVALUATE STRUCTR'L SOUNDNESS OF BOWSTRING USING FIELD VERIFICATIONS,CALCULATIONS,PROBES,ETC. EA.TRUSS&BEARINGS EVAL'D. ANY STRUCTR'L DEFICIENCIES SHORED.REPAIR DRWGS.FILED WITHIN 45 DAYS INSP'N