Manhattan West Village
400 Bleecker Street, Manhattan
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
8 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Dec 2, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.THE FIRE ESCPES ARE ON SEVERE STATE OF DISREPAIR: SUPPRT BRACKETS DTACHNG FRM BLDG@SOME LOCATIONS,RUSTED SREEL,MISSNG/ DETACHNG TREADS.2ND MEANS OF EGRESS COMPROMISED.IMMED SECURE FIRE ESCAPE TO THE BLDG&MAKE FIRE ESCAPE CODE COMPLIANT UNDR DRCT&CNTINUOUS SPRVSN OF PE..PE TO SBMT MEANS |
| Nov 26, 2025 | V*-DOB VIOLATION - DISMISSED | Z-ZONING NONE | 5 STORY MIX- USE NFP BUILDING WITH 8 DWELLING THAT INCLUDE.2A,2B,3A,3B,4A,4B,5A,5B AND COMMERCIAL SPACE AT GROUND FLOOR. BOTH FIRE ESCAPES IN STATE OF DISREPAIR COMPROMISING SECONDARY MEANS OF EGRESS. SECTION OF ANCHORING POINTS HAS DETACHED OR COMPLETELY MISSING. STEPS HAVE DETACHED AT VARIOUS LOCATIONS ON FIRE ESCAPE AS |
| Sep 2, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 2, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Feb 24, 2020 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | ERECT APPROXIMATELY 40 LINEAR FEET OF SIDEWALK AT EXPOSURE1(BLEECKER STREET) TO SAFEGUARD PUBLIC AND PROPERTY |
| Feb 10, 1997 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 18, 1993 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Apr 4, 1985 | V*-DOB VIOLATION - DISMISSED | LANDMRK-LANDMARK NONE | LANDMRK-LANDMARK NONE |