Manhattan Upper West Side (Central)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Feb 13, 2020 | V*-DOB VIOLATION - DISMISSED | P-PLUMBING NONE | COMMISSIONER'S REQUEST FOR CORRECTIVE ACTION. I OBSERVED IN THE CELLAR AREA OF THE BUILDING, 2 GAS DRYERS INSTALLED WITH GAS PIPING, WITHOUT ANY FIRE SUPPRESSION SYSTEM INSTALL OVER THEM IN CASE OF A FIRE. |
| May 15, 2014 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| Sep 16, 1997 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 29, 1995 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |