NYC Building Report

Manhattan Financial District-Battery Park City

39-41 Ann St, Manhattan

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

154 records

Date Status Type Summary
Aug 9, 1988 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED (9)HAVE SWITCH RETURN TO CENTER (24)RESHACKLE AND TAG(28)EXCESSI VE OIL, HOIST MACHINE.(33)1 ST FLOOR (33)1ST FLOOR-PROVIDE APPROVED TYPE INTERLOCK FILE BN WITH THIS DEPT.OBTAIN PERMIT BEFORE STARTING WORK
Aug 9, 1988 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED (21 & 24 )RESHACKLE AND TAG (51)REPAIR OVERHEAD SHEAVE ROOM (52)REPAIR ELECTRIC EYE. (37)REFRAIN FROM STOPPING AT 2ND FLOOR IN BOTH DIRECTIONS, WHEN NOT ENGAGED FROM HALL CAAR BUTTON
Aug 9, 1988 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED (15)SECURE FROM CAR TOP DOWN (21 & 24)RESHACKLE AND TAG (51) REPAIR OVERHEAD SHEAVE ROOM WALL (52)REPAIR ELECTRIC EYE. (37)REFRAIN FROM STOPPING AT 2ND FLOOR IN BOTH DIRECTIONS,WHEN NOT ENGAGED FROM HALL CAR BUTTON
Aug 9, 1988 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED (35) PROVIDE COVERS WHERE NECESSARY (51)REPAIR OVERHEAD SHEAVE ROOM WALL (21 & 24)RESHACKLE AND TAG