Manhattan Kingsbridge-Marble Hill
36 Marble Hill Avenue, Manhattan
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
24 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Mar 12, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN RETAINING WALL.REAR RETAINING WALL@EXP 3/2 (NORTHEASRT)CRNR OF LOT.EXCESSIVE PLANT GRWTH FRM TOP OF PROPERTIES 1.NYS PE STRCTRL ENGNEER TO IMMED EVAL ALL RETAINING WALLS ON PROPERTY&DSGN RPAIRS,2.FILE FOR RPAIRS BY 8/17/24 |
| Mar 12, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILYRE TOI MAINTAIN RETAINING WALL.REAR RETAINING WALL IN STATE OF DISREPAIR.TWO LARGE TREES GROWNG FROM REMAINING WALL@EXP3/4(SOUTHEAST) CORNER OF LOT.CRACKS IN REMAINING WALL&OUTWARD DISPLACEMENT.1.NYS PE STRCTRL ENG TO IMMED EVAL ENT PROPERTIES RETAINING WALL&DSGN REPAIRS, 2.FILE FOR RPAIRS BY 6/17/24,3.OBTN PRMTS |
| Mar 12, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK.BLDG SFFRD A 3-ALARM FIRE ON 3/11/24,INTERIOR WOOD FRAMED STAIR SEVERELY CHARRD W/MISSNG HANDRAILS FROM 1STFL TO ROOF STAIR BULKHEAD SEVERELY FIRE DAMAGED W/CHARRD ROOF FRAMNG&LARGE 1.IMMED INSTALL TEMP ROOF&TEMP STAIR HANDRAILS,&TEMP STRCTRL FRAMNG OR SHORNG@DIRECTION OF NYSPE,2.ALL WRK TO BE DRCTD |
| Mar 12, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN DUE TO FIRE.BLDG SUFFRD A 3-ALARM FIRE ON 3/11/24 INTERIOR WOOD FRAMED STAIR SEVERELY CHARRD WITH MISSING HANDRAILS, CHARRD FRAMNG&SHARRD SUBTREADS/LANDNGS FRM 1STFL TO ROOF.1.NYSPE STRCTRL ENGNEER TO IMMED EVAL ENT BLDG&DSGN RPAIRS,2.FILE FOR RPAIRS BY 5/6/24,3.OBTN PRMT&STRT WRK BY 5/20/24 |
| Mar 12, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.EXTERIOR WALLS IN STATE OF DISREPAIR CORNICE@EXP1 SEVERELY DETERIORATD W/OPEN HOLES&RUSTED METALS.STONE BRACKET SUPPRTNG FIRE ESCAPE LANDNG/BALCONY ON 2NDFL BROKEN@EXP1.1.NYS PE STRCTRL ENGNEER TO IMMED EVAL ENT BLDG&DSGN RPAIRS2.FILE FOR RPAIRS BY 6/10/24 3.OBTN PRMTS&STRT WRK BY 6/24/24 |
| Mar 12, 2024 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: PROVIDE AN APPROX. 130 LINEAR FEET OF SIDEWALK SHED AT PROPERTY LINE ALONG EXP 1 (30 LINEAR FEET) AND EXP 4 (100 LINEAR FEET) |
| Mar 12, 2024 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: SEAL ALL FIRE DAMAGED OPENINGS TO SAFEQUARD THE PUBLIC AND PRO PERTY |
| Mar 11, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | PREMISES RENDERED NON COMPLIANT DUE TO THREE ALARM FIRE. NOTED: THERE IS EXTENSIVE SMOKE, WATER AND FIRE DAMAGE TO ALL FLOORS WITH HALLWAY, STAIRS AND BULKHEAD BURNT AND CHARRED. THE ROOF HAS SEVERAL OPENINGS WITH WINDOWS REMOVED AND APARTMENT DOORS ARE BROKEN OPEN AND/OR REMOVED. |
| Mar 3, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT |
| May 15, 2014 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| Mar 26, 2002 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 27, 2001 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 7, 2000 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 16, 1999 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| May 4, 1998 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Sep 1, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 8, 1989 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Aug 8, 1989 | VP-VIOLATION UNSERVED ECB-ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Mar 6, 1989 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Mar 6, 1989 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Jan 17, 1989 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Jan 17, 1989 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Dec 19, 1988 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Dec 19, 1988 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |