Manhattan Hell's Kitchen
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
95 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Feb 20, 2026 | V*-DOB VIOLATION - DISMISSED | P-PLUMBING NONE | BASED ON LIC # 1516 BEING SURRENDERED, STOP ALL PLUMBING WORK UNDER JOB # M01055112 IMMEDIATELY. |
| Feb 20, 2026 | V*-DOB VIOLATION - DISMISSED | P-PLUMBING NONE | BASED ON LIC # 1516 BEING SURRENDERED, STOP ALL PLUMBING WORK UNDER JOB # M01069418 IMMEDIATELY. |
| Feb 19, 2026 | V*-DOB VIOLATION - DISMISSED | P-PLUMBING NONE | BASED ON LIC # 1516 BEING SURRENDERED, STOP ALL PLUMBING WORK UNDER JOB #M01069405 IMMEDIATELY. |
| Feb 19, 2026 | V*-DOB VIOLATION - DISMISSED | P-PLUMBING NONE | BASED ON LIC # 1516 BEING SURRENDERED, STOP ALL PLUMBING WORK UNDER JOB # M01273166 IMMEDIATELY. |
| Nov 14, 2025 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 23, 2024 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Mar 15, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | OBSERVED CELLAR FLOOR, CEILING AND GIRDER BEAM UNSTABLE CONDITION WITH INADEQUATE ADJUSTABLE SCREW JACK SHORING, FLOOR EXCAVATED FOR TRENCHES, CEILING DAMAGED WITH FALLING A PARTS AND SAGGING. ALSO OBSERVED 1ST TO 5TH FLOOR STAIRWELL & PUBLIC HALLWAY FLOORING LEANING. |
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 25, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Nov 2, 2021 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Aug 4, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 4, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 4, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 2, 2021 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Jun 2, 2021 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Jan 9, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 8, 2019 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT |
| Jun 13, 2018 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 13, 2018 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Apr 6, 2018 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Nov 29, 2017 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jul 26, 2017 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 18, 2017 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED FOR APPLICATION #121500857. THE CONTRACTOR OF RECORD HAS WITHDRAWN AS PERMIT HOLDER. S TOP ALL WORK, MAKE SITE SAFE. PROVIDE ALL REQUIRED INFORMATION FORTHWI TH |
| Mar 18, 2017 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED FOR APPLICATION #121471237. THE CONTRACTOR OF RECORD HAS WITHDRAWN AS PERMIT HOLDER. S TOP WORK, MAKE SITE SAFE. PROVIDE ALL REQUIRED INFORMATION FORTHWITH |
| Mar 18, 2017 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED FOR APPLICATION #121161287. THE CONTRACTOR OF RECORD HAS WITHDRAWN AS PERMIT HOLDER. S TOP WORK AND MAKE SITE SAFE. PROVIDE ALL REQUIRED INFORMATION FORTHWIT H |
| Mar 18, 2017 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED FOR APPLICATION #121500848. THE CONTRACTOR OF RECORD HAS WITHDRAWN AS PERMIT HOLDER. S TOP ALL WORK, MAKE SITE SAFE. PROVIDE ALL REQUIRED INFORMATION FORTHWI TH |
| Mar 18, 2017 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED FOR APPLICATION #121471200. THE CONTRACTOR OF RECORD HAS WITHDRAWN AS PERMIT HOLDER. S TOP WORK AND MAKE SITE SAFE. PROVIDE ALL REQUIRED INFORMATION FORTHWIT H |
| Mar 18, 2017 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED FOR APPLICATION #121161303. THE CONTRACTOR OF RECORD HAS WITHDRAWN AS PERMIT HOLDER. S TOP WORK AND MAKE SITE SAFE. PROVIDE ALL REQUIRED INFORMATION FORTHWIT H |
| Mar 18, 2017 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED FOR APPLICATION #121471228. THE CONTRACTOR OF RECORD HAS WITHDRAWN AS PERMIT HOLDER. S TOP ALL WORK AND MAKE SITE SAFE. PROVIDE ALL REQUIRED INFORMATION FORT HWITH |
| Mar 18, 2017 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED FOR APPLICATION #121161296. THE CONTRACTOR OF RECORD HAS WITHDRAWN AS PERMIT HOLDER. S TOP ALL WORK, MAKE SITE SAFE. PROVIDE ALL REQUIRED INFORMATION FORTHWI TH |
| Mar 18, 2017 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED FOR APPLICATION #121500937. CONTRACTOR OF RECORD HAS WITHDRAWN AS PERMIT HOLDER. STOP ALL WORK AND MAKE SITE SAFE. PROVIDE ALL REQUIRED INFORMATION FORTHWIT H |
| Mar 18, 2017 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED FOR APPLICATION #121161312. THE CONTRACTOR OF RECORD HAS WITHDRAWN AS PERMIT HOLDER. S TOP ALL WORK AND MAKE SITE SAFE. PROVIDE ALL REQUIRED INFORMATION FORT HWITH |
| Mar 18, 2017 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED FOR APPLICATION #121500884. THE CONTRACTOR OF RECORD HAS WITHDRAWN AS PERMIT HOLDER. S TOP WORK AND MAKE SITE SAFE. PROVIDE ALL REQUIRED INFORMATION FORTHWIT H |
| Mar 18, 2017 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED FOR APPLICATION #121471219. THE CONTRACTOR OF RECORD HAS WITHDRAWN AS PERMIT HOLDER, S TOP WORK AND MAKE SITE SAFE. PROVIDE ALL INFORMATION FORTHWITH |
| Mar 17, 2017 | V*-DOB VIOLATION - DISMISSED | P-PLUMBING NONE | BOROUGH COMMISSIONER HAS ISSUED A NOTICE OF IMMEDIATE STOP WORK ORDER DUE TO APPLICANT WITHDRAWAL OF APPLICATION #121161312 AS OF 03/17/17 STOP ALL WORK IMMEDIATELY. SUBMIT ALL REQUIRED DOCUMENT TO BOROUGH COMMISSIONER'S OFFICE |
| Mar 17, 2017 | V*-DOB VIOLATION - DISMISSED | P-PLUMBING NONE | BOROUGH COMMISSIONER HAS ISSUED A NOTICE OF IMMEDIATE STOP WORK ORDER DUE TO APPLICANT WITHDRAWAL OF APPLICATION #121161296 AS OF 03/17/17 STOP ALL WORK IMMEDIATELY. SUBMIT ALL REQUIRED DOCUMENT TO BOROUGH COMMISSIONER'S OFFICE |
| Mar 17, 2017 | V*-DOB VIOLATION - DISMISSED | P-PLUMBING NONE | BOROUGH COMMISSIONER HAS ISSUED A NOTICE OF IMMEDIATE STOP WORK ORDER DUE TO APPLICANT WITHDRAWAL OF APPLICATION #140400876 AS OF 03/17/17 STOP ALL WORK IMMEDIATELY. SUBMIT ALL REQUIRED DOCUMENT TO BOROUGH COMMISSIONER'S OFFICE |
| Mar 17, 2017 | V*-DOB VIOLATION - DISMISSED | P-PLUMBING NONE | BOROUGH COMMISSIONER HAS ISSUED A NOTICE OF IMMEDIATE STOP WORK ORDER DUE TO APPLICANT WITHDRAWAL OF APPLICATION #121471228 AS OF 03/17/17 STOP ALL WORK IMMEDIATELY. SUBMIT ALL REQUIRED DOCUMENT TO BOROUGH COMMISSIONER'S OFFICE |
| Mar 17, 2017 | V*-DOB VIOLATION - DISMISSED | P-PLUMBING NONE | BOROUGH COMMISSIONER HAS ISSUED A NOTICE OF IMMEDIATE STOP WORK ORDER DUE TO APPLICANT WITHDRAWAL OF APPLICATION #121161287 AS OF 03/17/17 STOP ALL WORK IMMEDIATELY. SUBMIT ALL REQUIRED DOCUMENT TO BOROUGH COMMISSIONER'S OFFICE |
| Mar 17, 2017 | V*-DOB VIOLATION - DISMISSED | P-PLUMBING NONE | BOROUGH COMMISSIONER HAS ISSUED A NOTICE OF IMMEDIATE STOP WORK ORDER DUE TO APPLICANT WITHDRAWAL OF APPLICATION #140400901 AS OF 03/17/17 STOP ALL WORK IMMEDIATELY. SUBMIT ALL REQUIRED DOCUMENT TO BOROUGH COMMISSIONER'S OFFICE |
| Mar 17, 2017 | V*-DOB VIOLATION - DISMISSED | P-PLUMBING NONE | BOROUGH COMMISSIONER HAS ISSUED A NOTICE OF IMMEDIATE STOP WORK ORDER DUE TO APPLICANT WITHDRAWAL OF APPLICATION #121471200 AS OF 03/17/17 STOP ALL WORK IMMEDIATELY. SUBMIT ALL REQUIRED DOCUMENT TO BOROUGH COMMISSIONER'S OFFICE |
| Mar 17, 2017 | V*-DOB VIOLATION - DISMISSED | P-PLUMBING NONE | BOROUGH COMMISSIONER HAS ISSUED A NOTICE OF IMMEDIATE STOP WORK ORDER DUE TO APPLICANT WITHDRAWAL OF APPLICATION #121161303 AS OF 03/17/17 STOP ALL WORK IMMEDIATELY. SUBMIT ALL REQUIRED DOCUMENT TO BOROUGH COMMISSIONER'S OFFICE |
| Mar 17, 2017 | V*-DOB VIOLATION - DISMISSED | P-PLUMBING NONE | BOROUGH COMMISSIONER HAS ISSUED A NOTICE OF IMMEDIATE STOP WORK ORDER DUE TO APPLICANT WITHDRAWAL OF APPLICATION #140400894 AS OF 03/17/17 STOP ALL WORK IMMEDIATELY. SUBMIT ALL REQUIRED DOCUMENT TO BOROUGH COMMISSIONER'S OFFICE FORTHWITH |
| Mar 17, 2017 | V*-DOB VIOLATION - DISMISSED | P-PLUMBING NONE | P-PLUMBING NONE |
| Mar 17, 2017 | V*-DOB VIOLATION - DISMISSED | P-PLUMBING NONE | BOROUGH COMMISSIONER HAS ISSUED A NOTICE OF IMMEDIATE STOP WORK ORDER DUE TO APPLICANT WITHDRAWAL OF APPLICATION #121471219 AS OF 03/17/17 STOP ALL WORK IMMEDIATELY. SUBMIT ALL REQUIRED DOCUMENTS TO BOROUGH COMMISSIONER'S OFFICE FORTHWITH |
| Mar 17, 2017 | V*-DOB VIOLATION - DISMISSED | P-PLUMBING NONE | BOROUGH COMMISSIONER HAS ISSUED A NOTICE OF IMMEDIATE STOP WORK ORDER DUE TO APPLICANT WITHDRAWAL OF APPLICATION #121471237 AS OF 03/17/17 STOP ALL WORK IMMEDIATELY. SUBMIT ALL REQUIRED DOCUMENTS TO BOROUGH COMMISSIONER OFFICE |