NYC Building Report

Manhattan Hell's Kitchen

350 West 52 Street, Manhattan

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

11 records

Date Status Type Summary
Jun 14, 2019 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL ERECT APPROX. 25 LINEAR FEET OF TIGHTBOARD FENCE AT EXP#1 TO SECURE PUBLIC FROM LOT.TO BE EXECUTED WITH IED FOR FENCE ISSUED AT 352 WEST 52 STREET,MN
Jun 10, 2019 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL PARTIALLY DEMOLISH ENTIRELY OF THE ABOVE-GRADE PORTION OF THE STRUCT 1ST FL FRAMING SLAB-ON-GRADE OF THE REAR EXTENSION,AND SLAB-ON-GRADE OF THE CELLAR.THE FOUNDATION WALLS ARE TO REMAIN, SLABS-ON-GRADE MAY BE CRACKED IN LIEU OF REMOVAL.CELLAR BE BACKFILLED WITH CLEAN FILL PROVIDE DRAINAGE PER DEPARTMENT REGULATIONS
Oct 10, 2018 V-DOB VIOLATION - ACTIVE UB-UNSAFE BUILDINGS NONE UB-UNSAFE BUILDINGS NONE
May 30, 2018 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Mar 20, 2018 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM.4 STRY+CELL,WOODFRAMED,MASONRY BEAR WALL,MIX USE,VACATED BLDG W/A 1 STRY EXT OUT REAR.REAR CHIMNEY AT EXP 4 HAS DETERIORATED MORTAR JOINTS,CRACKS&MISS BRICKS.THERE ARE PILES OF DEBRIS THRUOUT BLDG REMEDY:OWN OBTAIN PERM FOR PART DEMO OF CHIMNEY NO LATER 4/9/18&COMP WRK NO LATER 4/13/18.DWGS&SEQ TO BE SUB TO JILL(FEU)NO LATER 4/16/18
Aug 23, 2017 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jun 28, 2017 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Feb 8, 2017 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FM.COND 4 STORY WOOD FRAMED MASONRY BEARING WALL.THROUGHOUT 1ST-4TH FL FRAMING,THERE ARE MULT LOCS OF DAMAGED WOOD JOISTS&MISSING FLRING LOCALIZED PART COLLAPSESS OF FLRS&ROTTED&SPLIT JOISTS&SEVERAL SMALL& MED SIZE HOLES IN ROOF.REMEDY:OWNER ENGAGE LICPR TO REPAIR BLDG OR DEMO BLDG PER REQ OF SPEC ZONING DISTRICT.DWG BE FILE W/DOB BY 3/31/17
Feb 24, 1997 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jan 22, 1997 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jan 22, 1997 VP-VIOLATION UNSERVED ECB-ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL