NYC Building Report

Manhattan Harlem (North)

347 Lenox Avenue, Manhattan

HPD violations

Housing Maintenance Code violations are filed by tax lot (BBL 1-01912-0032), so they can include other buildings on the same lot.

9 records

Date Class Status Apartment Summary
Aug 20, 2026 A NOTICE OF ISSUANCE SENT TO TENANT 3A § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
Aug 20, 2026 B NOV SENT OUT 3A § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
Jun 4, 2025 A VIOLATION DISMISSED Not available (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
Feb 17, 2024 B NOV SENT OUT 3A § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
Feb 17, 2024 B NOV SENT OUT 3A § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
Feb 17, 2024 C NOV SENT OUT Not available § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM
Feb 17, 2024 C NOV SENT OUT 3A § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
Mar 15, 2023 A VIOLATION DISMISSED Not available (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
Oct 22, 2017 B VIOLATION DISMISSED Not available § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING MINIMUM OF 100 WATTS AS REQUIRED(LIGHT FIXTURE(S) PRESENT). AT FRONT AREAWAY