| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Nov 8, 2019 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT |
| Jun 28, 2019 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | SUBMITTAL OF CONSTRUCTION DRAWINGS:LANDMARK BUILDING UNDER STRUCTURAL MONITORING.ON 3-20-19 ALT# 123544334 WAS PERMITTED FOR CONSTRUCTION HOWEVER WORK WAS NOT COMMENCED ON THIS STRUCTURALLY DEFICIENT FACADE DUE TO ORGANIZATION OF DOB/LPC PERMITTED DRAWINGS.BY 7/3/19,PROVIDE DOB/LPC WITH CORRECTED DRAWINGS SO THAT CONSTRUCTION MAY PROCEED |
| Jan 9, 2019 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 26, 2018 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAIL TO COMP W/COMM ORDER.ON 9/27/18 VISIT SITE TO REVIEW PROGRESS ON RPRS TO UNSAFE BLDG THAT WAS PART STAB BY OWN TO MAKE SAFE NON COMP VERT&HORIZ ADDITION.NO FACADE RPRS UNDERTAKEN&FACADE REMAIN UNSAFE, DESPITE OWNER ASSURANCE THAT RPRS WILL BE OCCUP.REMEDY:UNDERTAKEN TO MULT DWLG&NO DRG FILED.COMP W/CODE.MAKE BLDG SAFE RPR FACADE |
| May 12, 2017 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | 339 W 29TH ST IS A 5 STRY MASONRY BLDG UND ALT THAT IS HALTED&BLDG IS UNSAFE.THERE ARE 2 OCCUPIED APTS.BLDG WILL BE SHORED&REPAIR WORK UNDER TAKEN.CURRENTLY BLDG HAS TO BE STRL MONITORED DAILY.REMEDY:PROV STRL ENG'R OBSERVATIONS&REPORT DAILY,NOTING ALL FOOTERS,5THFL,ROOF,WALLS, STRL STAB |
| May 11, 2017 | V*-DOB VIOLATION - DISMISSED | EGNCY-EMERGENCY NONE | PARTIAL DEMO |
| Aug 24, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 10, 2016 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 2, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMMISSIONERS ORDER. COMMISSIONERS ORDER 050616FEU10408MM, CONTROL NO. 327978 REQUIRES THE OWNER TO SUBMIT INFORMATION BY 5/26/16 NO INFORMATION HAS BEEN RECEIVED AS OF 6/2/16 REMEDY: IMMEDIATELY COMPLY WITH ORDER AND SUBMIT INFORMATION NO LATER THAN 6/17/16 |
| Jun 2, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMMISSIONERS ORDER. COMMISSIONERS ORDER 050616FEU10407MM, CONTROL#327977 REQUIRES OWNER TO SUBMIT INFORMATION BY 5/26/16.NO INFORMATION HAS BEEN RECEIVED AS OF 6/2/16 REMEDY: IMMEDIATELY COMPLY WITH ORDER AND SUBMIT INFORMATION NO LATER THAN 6/17/16 |
| Jun 2, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMMISSIONERS ORDER. COMMISSIONERS ORDER 050616FEU10406MM, CONTROL NO. 327976 REQUIRES OWNER TO SUBMIT INFORMATION BY 5/26/16. NO INFORMATION HAS BEEN RECEIVED AS OF 6/2/16 REMEDY:IMMEDIATELY COMPLY WITH ORDER AND SUBMIT INFORMATION NO LATER THAN 6/17/16 |
| Jun 2, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMMISSIONERS ORDER. COMMISSIONERS ORDER 050616FEU10405MM, CONTROL NO. 327900 REQUIRES OWNER TO SUBMIT INFORMATION BY 5/26/16. NO INFORMATION HAS BEEN RECEIVED AS OF 6/2/16 REMEDY: IMMEDIATELY COMPLY WITH ORDER AND SUBMIT INFORMATION NO LATER THAN 6/17/16 |
| Jun 2, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMMISSIONERS ORDER. COMMISSIONERS ORDER 050616FEU10404MM, CONTROL NO. 327899 REQUIRES OWNER TO SUBMIT INFORMATION BY 5/26/16 AS OF 6/2/16 NO INFORMATION WAS RECEIVED REMEDY: IMMEDIATELY COMPLY WITH ORDER AND SUBMIT INFORMATION NO LATER THAN 6/17/16 |
| Jun 2, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WOTH COMMISSIONERS ORDER. COMMISSIONERS ORDER 050616FEU10403MM, CONTROL NO. 327898 REQUIRES OWNER TO SUBMIT INFORMATION BY 5/26/16 AS OF 6/2/16 NO INFORMATION WAS RECEIVED REMEDY: IMMEDIATELY COMPLY WITH ORDER AND SUBMIT INFORMATION NO LATER THAN 6/17/16 |
| Jun 2, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMMISSIONERS ORDER. COMMISSIONERS ORDER 050616FEU10402MM,CONTROL NO. 327897 REQUIRES OWNER TO SUBMIT INFORMATION BY 5/26/16. AS OF 6/2/16 NO INFORMATION WAS RECEIVED REMEDY: IMMEDIATELY COMPLY WITH ORDER AND SUBMIT INFORMATION NO LATER THAN 6/17/16 |
| Jun 2, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMMISSIONERS ORDER.COMMISSIONERS ORDER CONTROL NO. 327896 REQUIRES OWNER TO SUBMIT STRUCTURAL DRAWINGS TO DOB FORENSIC ENGINEERING BY 5/26/16. AS OF 6/2/16 NO INFORMATION WAS RECEIVED. REMEDY: IMMEDIATELY COMPLY WITH ORDER AND SUBMIT DRAWINGS NO LATER THAN 6/17/16 |
| May 6, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| May 6, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | THE BLDG WAS ALTERED UNDER JOB#10390733.THE LOAD PATH OF THE BLDG WAS SIGNIFICANTLY ALTERED RESULTING IN MORE THAN 5% INCREASE IN THE LOAD ON THE EXISTING FOUNDATIONS.PURSUANT TO 1802.0 A GEOTECHNICAL REPORT IS REQUIRED TO DETERMAINE THAT THE FOUNDATIONS ARE SUFFICICENT.REMEDY: SUBMIT THE INFORMATION TO DOB FEU BY 5/26/16 PROVIDE GEOTECHNICAL RPRT |
| May 6, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | PER 28-104.7.11 DOB CAN REQUEST ADDT'L INFORMATION. THE ENTIRE EXTENT OF WORK IS TO BE SHOWN ON THE CONSTRUCTION DWGS.THE BLDG HAS BEEN SUBSTANIALLY ALTERED IN THAT AN ADDT'L FLR WAS ADDED ON TOP OF EXISTING STRUCTURE.NO DETAILS ARE SHOWN ON THE DGWS.REMEDY:SUBMIT INFORMATION TO DOB FEU NY 5/26/16 IMMED PROVIDE THE PRE-PERMIT CAL |
| May 6, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FM BLDG.ANALYSIS REQUIRMENTS ARE DEFINED IN 1604.4 NO DETAILS ARE SHOWN ON THE DWGS SUBMITTED UNDER JOB#10307337 REGARDING THE REMOVAL & INSTALLATION OF STEEL BEAMS IN THE BSMT FRAMING.THE FRONT OF THE BSMT FRAMING WAS REMOVED & REPLACED WITH +/-15FT LONG BY 4' DEEP STEEL BEAM REMEDY:SUBMIT INFORMATION TO DOB FEU BY 5/26/16 |
| May 6, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | SUPPORT OF PARTY WALL SECTION 3309.4.0 NOTES THAT ITS THE OWNERS RESPONSIBILITY TO PROTECT PARTY WALLS DURING EXCAVATION & SUPPORT THEM W/PROPER FOUNDATIONS.THE WALLS ARE TO REMAIN PRACTICALLY AS SAFE AS IT WAS BEFORE THE EXCAVATION WAS COMMENCED. REMEDY:PROVIDE TECHNICAL REPORT DETALING THE STRUCTURAL SUPPORT.SUBMIT TO DOB FEU BY 5/26/16 |
| May 6, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | POST INSTALLED ANCHORS SECTION 1704.32 REQUIRES SPEIAL INSPECTION FOR THE INSTALLATION OF POST-INSTALLED MECHANICAL,ADHESIVE & SCREW ANCHORS THE BLDG HAS A NEW BULKHEAD STRUCTURE INSTALLEDON TOP PF THE EXISTING PARAPET.REMEDY:PROVIDE DOB W/ALL TRI-PICTURES AND REPORTS FOR 1704.32 POST INSTALLED ANCHORS SUBMIT INFO TO DOB FEU NO LATER THAN 5/26/16 |
| May 6, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | SECTION 1704.20.2 REQUIRES SPECIAL INSPECTION FOR METHODS EMPLOYED TO PROTECT THE SIDES OF EXCAVATIONS.THE CELLAR OF THE BLDG WAS LOWERED AND REPLACED REQUIRING EXCAVATION,PROTECTION AND SPECIAL INSPECTIONS REMEDY:PROVIDE THE DOB W/ALL TRI-PICTURES & REPORTS FOR 1704.20.2 EXCAVATIONS SUBMIT INFORMATION TO DOB FORENSIC NO LATER THAN 5/26/16 |
| May 6, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | THE DOB CAN REQUEST ADDT'L INFORMATION PER 28-104.7.1 THE ENTIRE EXTENT OF WORK IS TO BE SHOWN ON CONSTRUCTION DWGS.THE BLDG HAS BEEN SUBSTANTIALLY ALTERED ON THAT AN ADDT'I FLR WAS ADDED ON TOP OF THE EXISTING STRUCTURE.THE DWGS SUBMITTED UNDER JOB#10307337.REMEDY:IMMED PROVIDE THE PRE-PERMIT STRUCTURAL CALCULATIONS FOR THE 2FLR FRAMING |
| May 6, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | THE DOB REQUEST ADDT'L INFORMATIONPER 28-104.701 THE ENTIRE EXTENT OF WORK IS TO BE SHOWN ON THE CONSTRUCTION DWGS.PROVIDE STRUCTURAL ENG'R DWGS TO THE DEPT OF BLDGS TO REFLECT THE ADDT'L WORK DONE UNDER JOB # 103907337.REMEDY:BY 5/26/16 SUBMIT STRUCTURAL DWGS FOR THE BLDG TO MATT MILNER,PE,DOB FORENSIC ENGINEERING UNIT 280 BROADWAY NY NY 10007 |
| Mar 3, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT |
| Dec 13, 2011 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT |
| Aug 24, 2011 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Apr 6, 2011 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 6, 2010 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DOB VIOLATION ISSUED FOR WORK W/OUT AFTER HOURS VARIANCE PERMIT |
| Jul 28, 2009 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Jan 1, 2009 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Oct 21, 2008 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Feb 25, 2008 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Feb 25, 2008 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Jan 3, 2008 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Oct 19, 2007 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| May 9, 2007 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| May 9, 2007 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Feb 13, 2004 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| May 4, 1998 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |