Manhattan Chelsea-Hudson Yards
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
37 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Dec 11, 2024 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 11, 2024 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 11, 2024 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 11, 2024 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 27, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Nov 27, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Jul 24, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | BOROUGH COMMISSIONER STOP WORK ORDER APPLICATION #123851796DUE TO SITE SAFETY MANAGER WITHDRAWAL. SUPERSTRUCTURE IS ERECTED, HOWEVER, NO ACCESS TO INTERIOR DUE TO CLOSED SITE AND I'M UNABLE TO DETERMINE PERCENTAGE COMPLETED. STOP ALL WORK UNDER JOB # REFERENCED AND MAKE SITE SAFE. |
| Jun 12, 2024 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 12, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | BOROUGH COMISSIONER OFFICE INTENT TO REVOKE APPROVALS AND PERMIT STOP WORK IMMEDIATELY APPLICATION #123851796 |
| Jun 12, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STOP ALL WORK IMMEDIATELY AND MAKE THE SITE SAFE. KINDLY CONTACT THE BOROUGH COMMISSIONER'S OFFICE AT (212) 393-2615 AS SOON AS POSSIBLE WITH APPROPRIATE INFORMATION IN RESPONSE TO THIS LETTER. |
| Apr 3, 2024 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 15, 2023 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 4, 2023 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 16, 2022 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | PROVIDE 90 LINEAR FEET OF SIDEWALK SHED AT EXPOSURE#1(WEST 35TH STREET ) TO PROTECT THE PUBLIC, PROPERTY AND PEOPLE |
| Apr 9, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | BOROUGH COMMISSIONER HAS ISSUED A STOP WORK ORDER UNDER APPLICATION #123851796, DUE TO INTENT TO REVOKE APPROVAL(S) AND PERMIT(S). UNABLE TO DETERMINE % OF WORK COMPLETED. ORDER(S) TO STOP ALL WORK IMMEDIATELY AND MAKE THE SITE SAFE. |
| Mar 31, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 31, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 31, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 16, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 2, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 2, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 2, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 2, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 8, 2019 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT |
| Dec 28, 2018 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK PERFORMED WITHOUT PERMIT TEMPORARY SHORING WAS OBSERVED AT ALL FLOORS NO APPLICATION OR PERMITS ON FILE FOR TEMP SHORING OWNER TO RETAIN NYS LIC PE TO EVALUATE SHORING AND FILE WORK AFTER APPLICATION OWNER TO OBTAIN PERMIT AND PERFORM ANY REPAIRS PER ENGINEER UNDER PERM COMPLETE ALL WORK BY 2/15/19 |
| Dec 28, 2018 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK PERFORMED WITHOUT PERMIT TEMPORARY SHORING WAS OBSERVED AT ALL FLOORS NO APPLICATION OR PERMITS ON FILE FOR TEMP SHORING.OWNER TO RETAIN NYS LIC PE TO EVALUATE SHORING AND FILE WORK AFTER APPLICATION OWNER TO OBTAIN PERMIT AND PERFORM ANY REPAIRS PER ENGINEER UNDER PERM COMPLETE ALL WORK BY 2/15/19 |
| Dec 28, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM:5S+C RESID BLDG WITH INDEP WALLS@EXP2&4 25X100 THROUGHOUT BLDG FL/ROOF FRMG WAS ROTTED ALL FLOOR ROOF FRMG VISIBLY SAGGING@MIDDLE OF BLDG TEMP SHOR PRESENT@ALL FLOORS WINDOWS@EXP1&3 REMOVED&ROS LEFT OPEN AND UNSEALED REMEDY:ONWER REPAIR BLDG U/PMT HIRE NYS LIC PE EVAL ENT BLDG FILE PLANS BY 2/15/19 BEGIN WRK BY 3/1/19 COMPL WRK BY 9/1/19 |
| Dec 28, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM:5S+C RESID BLDG INDEP WALL@EXP2&PARTY WALL@EXP4 25X72 ON INT LOT 25X100 ORIG FL&ROOF FRMG HAD BEEN REPL WITH NEW DRESSED LUMBER JOIST POCKET NOT GROUTED&JOIST HELD IN PLACE LOOSE MSNRY&WOODWEDGES WINDOWS@ EXP1&3REMOVE&ROS OPEN&UNSEALED REMEDY:OWNER REPAIR BLDG U/PMT HIRE NYS LIC PE EVAL ENT BLDG FILE PLNS BY 2/15/19 BGN WRK 3/1/19 COMPWRK9/1/19 |
| Apr 6, 2018 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Mar 1, 2013 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT |
| Dec 13, 2011 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT |
| Dec 26, 1995 | VP*-VIOLATION UNSERVED ECB- DISMISSED | B-BOILER BOILER OPTIONAL | B-BOILER BOILER OPTIONAL |