Manhattan Midtown South-Flatiron-Union Square
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
163 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 9, 1989 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | (51) PROVIDE PROPER CLEARENCE BETWEEN THE CWT AND THE BUFFER (52) REFORM JUMPS WIRES FROM THE BACK OF THE CONTROLLER |
| Jun 5, 1989 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | (51) PUT BACK TO SERVICE SO A PROPER INSPECTION CAN BE MADE |
| Jun 5, 1989 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | (51)PROVIDE FAN GUARD (52)PROVIDE PROPER CLEARANCE BETWEEN THE COUNTERWEIGHT & THE BUFFER |
| Jun 5, 1989 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | (51)PUT SAFETY IN SERVICE SO A PROPER INSPECTION CAN BE MADE |
| Jun 5, 1989 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | (51)PROVIDE FAN GUARD (52)PROVIDE PROPER CLEARANCE BETWEEN THE CWT AND THE BUFFER |
| May 30, 1989 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | (51)PROVIDE PROPER CLEARANCE BETWEEN THE CWT AND THE BUFFER (52)CLEAN TOP OF CAR |
| May 24, 1989 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | (51) PROVIDE PROPER CLEARANCE BETWEEN THE COUNTERWEIGHT & THE BUFFER |
| May 24, 1989 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jul 13, 1988 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | (51)PROVIDE A NEW CAR FLOOR FOR ELEVATOR 11599.(52)PROVIDE A COVER FOR THE HOLE IN THE CEILING OF ELEVATOR 11599 |
| Jul 13, 1988 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | PROVIDE A COVER FOR THE HOLE IN THE CEILING OF ELEV |
| Jul 13, 1988 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | (51)REPAIR CAE CEILING (52)PROVIDE A PROPER LIGHT FIXTURE IN THE CAB |
| Jul 13, 1988 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jul 13, 1988 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | PROVIDE COVERS FOR THE HOLES IN THE CEILING OF ELEV |