Manhattan Upper West Side-Lincoln Square
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
58 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 29, 1995 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 18, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 18, 1993 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jul 10, 1989 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | (74) PROVIDE COVER FOR LEVEL UNIT (37) REPAIR OR REPLACE RELAY ON CONTROLLER |
| Jul 10, 1989 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | (74) PROVIDE MAINTENCE GURAD ON TOP OF ELEVATOR |
| Jul 10, 1989 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | (74) CLEAN TOP OF CAR |
| Jul 13, 1988 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | CONDUCT 5YR SAFETY TEST, DATE & TAG GOVERNOR |
| Jul 13, 1988 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | (28 & 29)REPAIR MACHINE LEAK (OIL ON SHEAVE)(51)CONDUCT 5YR SAFETY TEST, DATE & TAG GOVERNOR |