Jun 20, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Nov 8, 2019 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Aug 9, 2017 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL BORO-COMM
Feb 24, 2017 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Nov 28, 2016 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. AT THE TIME OF INSPECTION WE OBSERVED THE RETAINING WALL LOCATED AT THE REAR YARD WAS CRACK AND OUT OF PLUMB. ON 2/11/16 VIOLATION WAS ISSUED FOR FAILURE TO MAINTAIN THE STRUCTURE.REMEDY: IMMDEIATELY RETAIN A LIC. DESIGN PROFESSIONAL PROVIDE ENGINEERING ASSESMENT TO R/W UNIT BY 12/12/2016
Feb 11, 2016 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FM STRUCTURE IN A CODE COMPLIANT MANNER. AT REAR YARD PROPERTY LINE RETAINING WALL IS CRACKED AND OUT OF PLUMB. REMEDY: REQUIRE LIC DESIGN PROFESSIONAL TO EVALUATE RETAINING WALL AND SUBMIT REPORT TO FEU BY 6/6/16. CONSTRUCT NEW RETAINING WALL TO BE DESIGNED BY LIC DESIGN PROF WORK TO START NO LATER THAN 10/25/16
Feb 3, 2016 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL COMPLY WITH CODE
Feb 3, 2016 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL COMPLY WITH CODE
Feb 3, 2016 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FILE A CERTIFICATE FORM APPL. ETC. CONTAINING A MATERIAL FALSE STATEME NT(S) UNDER JOB APPL.#122144296, PW1 IS CHECK MARKED NO FOR REMAIN OCCUPIED AND RENT CONTROL/STABILIZATION.AT TIME OF INSPECTION MULTIPLE UNITS ARE OCCUPIED AND 5 UNITS ARE LISTED AS RENT STABILIZED WITH NYS HCR. REMEDY: COMPLY WITH CODE
May 15, 2014 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
May 15, 2014 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Feb 13, 2004 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 19, 2003 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Feb 27, 2001 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Feb 7, 2000 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 16, 1999 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED